My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-08-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 09-08-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:37 PM
Creation date
11/14/2006 2:37:13 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />., <br /> <br />Mr. Dave Reimer <br />Guidant Corporation <br />RE: Cummings Park Shelter <br /> <br />3 <br /> <br />Epoxy Flooring <br />. We have included epoxy flooring in the pTep kitchen, bathrooms <br />and janitor's room. <br /> <br />Painting <br />. <br /> <br />We have included painting all interior masonry, hollow metal <br />frames and doors, finish the soffits, fascia and seal the exterior <br />black. <br /> <br />Fire Extinguishers and Toilet Accessories <br />. We have included two (2) fire extinguishers, for the shelter grab <br />bars and basic toilet accessories to go into each bathroom. <br /> <br />Stainless Steel Counters <br />· We have included a stainless steel sewing counter and a stainless <br />sink/counter in the prep area. <br /> <br />Counter Curtain Roll-up <br />. We have included a standard 8'-0" x 5'-0" aluminum roll-up <br />curtain. <br /> <br />Plumbing <br />· We have included all necessary water, waste and vent piping with <br />one mop sink, two frost prost hydrants, three water closets, one <br />urinal, four lavatories and three floor drains. <br /> <br />HVAC <br /> <br />. <br /> <br />We have included two (2) 50,000 BTUH electrical furnaces, <br />exposed spiral duct for distribution, and exhaust for the restrooms <br />and janitor's closet. <br /> <br />Electrical <br />. The scope of electrical work is as follows: <br />. Trench a new underground 100 amp feeder. <br />. Purchase and install one (1) new 100 amp 3 phase service. <br />. Lighting in bathrooms, warming house, storage, food prep, <br />janitor's room, and exterior lighting. <br />. Outlets in restrooms (GF1), kitchen and six (6) general-purpose <br />outlets. <br />. Purchase and install two (2) electric hand dryers. <br />. Purchase and install two (2) new electric heaters. <br />. Power to mechanical units. <br /> <br />9/3/2003 <br /> <br />$5,491.00 <br /> <br />$7,655.00 <br /> <br />$2,741.00 <br /> <br />$5,200.00 <br /> <br />$2,075.00 <br /> <br />$13,900.00 <br /> <br />$12,800.00 <br /> <br />$16,900.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.