Laserfiche WebLink
<br />Mr. Dave Reimer <br />Guidant Corporation <br />RE: Cummings Park Shelter <br /> <br />4 <br /> <br />9/3/2003 <br /> <br />. <br /> <br />General Conditions <br />. Part-time supervisIOn, general cleanup, dumpsters, temporary <br />toilet, survey and layout, trucking and equipment, and testing <br />services. <br /> <br />$31,530.00 <br /> <br />Contractor's Fee <br />. Our contractor's overhead and profit is figured at 5% of the total <br />construction. <br /> <br />$21.445.00 <br />$450,509.00 <br /> <br />PROJECT TOTAL: <br /> <br />ALTERNATES <br />1. Delete 2' of the roof's overhang. <br />2. Change the half high block to 8" full high block. <br />3. Eliminate the concrete path at the west side of the shelter. <br />4. Eliminate the concrete path and stairs at the north side of the <br />shelter. <br />5. Delete the half high wall in between the column on the east <br />side of the patio. <br />6. Eliminate the bituminous pathway that leads out to Femwood <br />Avenue. <br />7. Eliminate the epoxy flooring. <br />8. Delete the aluminum roll-up curtain in the kitchen prep area. <br />9. Delete fire hydrant. <br />10. Deduct present budget from original design. <br />I 1. Asphalt patching is currently priced without milling the entire <br />cul-de-sac, it would be an add to mill the entire cul-de-sac. <br /> <br />Please feel free to contact me upon your review. <br /> <br />Very truly yours, <br /> <br />Kraus-Anderso11@ SPECIAL PROJECTS <br /> <br />Matthew (Matt) Johnson <br />Project Manager <br /> <br />MJllt <br /> <br />Deduct: $14,000.00 <br />Deduct: $15,000.00 <br />Deduct: $1,500.00 <br />Deduct: $2,500.00 <br />Deduct: $5,000.00 <br />Deduct: $3,275.00 . <br />Deduct: $5,491.00 <br />Deduct: $2,075.00 <br />Deduct: $2,600.00 <br />Deduct: $99,992.00 <br />Add: $9,975.00 <br /> <br />. <br />