My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-29-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 09-29-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2008 2:15:37 PM
Creation date
11/14/2006 2:37:24 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, . <br /> <br />C) <br /> <br />() <br /> <br />Staff Recommendation <br /> <br />. <br /> <br />In Planning Case #03-23 staff recommends approval of the Site Plan Review for Parking Ramp <br /># 1 subject to the following conditions: <br /> <br />I. The applicant shall submit to the City a landscape performance bond or other surety for <br />125% of the cost of materials and installation, valid one full year from the date of <br />installation, prior to the issuance of a building permit. <br /> <br />2. The applicant shall obtain all nccessary permits from the Rice Creek Water Shed District, <br />MPCA, and other governmental entities. <br /> <br />3. The applicant shall comply with the Zoning Code and related municipal ordinances. <br /> <br />4. The applicant shall provide the number of handicapped accessible parking spaces and access <br />aisles required by the State Building Code and ADA requirements. <br /> <br />5. The applicant shall clarify the request is for a four-level parking structure. Final plans should <br />be resubmitted which indicate parking areas, if level five or level one are not to be utilized <br />for parking areas this should be conveyed in the plans. Final plans should be resubmitted for <br />review by the City Planner, City Engineer, and Building Official, prior to the issuance of a <br />building permit. .. <br /> <br />6. The applicant shall submit a revised landscaping plan with planting schedule which clearly <br />identifies the landscaping materials to be planted around Parking Ramp #1 per approval of <br />the City Planner prior to the issuance of a building permit. <br /> <br />. <br /> <br />7. The applicant shall locate a fire hydrant near both East and West entrances to the ramp. <br /> <br />8. The applicant shall verify with the Fire Marshal the total amount of wall area that is open to <br />the atmosphere. <br /> <br />9. The applicant shall submit revised utility plans which show water going to the structure. <br /> <br />10. The applicant shall submit final plans showing standpipes and sprinkler system in the ramp <br />per approval of the Fire Marshal and Building Official. <br /> <br />11. The applicant shall submit final plans which verify the location of F.D.C. per approval of <br />Fire Marshal. The F.D.C. shall be located within ISO feet ofa fire hydrant. <br /> <br />e <br /> <br />PC #03-23-- PC Report 09103/2003 - Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.