My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-27-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 10-27-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:43 PM
Creation date
11/14/2006 2:38:03 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br />~HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />Agenda Item 8.B <br /> <br />October 22, 2003 <br /> <br />TO: Mayor and Council <br />Michelle Wolfe, City Administrator <br /> <br />FROM: Thomas J. Moore, Director of Operations and Maintenance 1qvvtlo/ <br /> <br />SUBJECT: Replacement of V ehicle #109; 1995 Ford F250 <br /> <br />Backl!round <br /> <br />On August 28, 2003 Operations and Maintenance (0 & M) vehicle #109 was involved in an <br />accident. The accident occurred at the intersection of Lake Valentine Road and Old Hwy 10. <br />Operations and Maintenance employee Aaron Andrews was the driver. No injuries were <br />involved. Ramsey County Sheriff's Department dispatched Deputy Greg Engfer to the scene. <br />An Accident Report was filed by Deputy Greg Engfer. The League of Minnesota Cities <br />Insurance Trust (LMCIT) was also contacted and all necessary reports were filed. Vehicle #109 <br />received extensive damage. It was un-drivable and had to be carried on a flatbed truck back to <br />the 0 & M facility. <br /> <br />Cost <br /> <br />The proposed replacement vehicle will be a 2004 Ford F250, Super Duty, 4x4 truck equipped <br />with a trailer tow package, snow plow package and maximum tread tires. The cost of this <br />vehicle, with Sales Tax and License included is $22,572.64. It will cost an additional $1,500.00 <br />to have the vehicle painted Arden Hills tan. Utilities, with Sales Tax, will cost an additional $5, <br />927.36. These utilities include the trailer tow package, snow plow package and a Whelen Dot III <br />light system. Final cost of proposed replacement vehicle is $30,000.00. The cost breakdown is <br />listed below: <br /> <br />Vehicle <br />Utilities <br />Painting <br /> <br />$22,572.64 <br />$5,927.36 <br />$1,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.