Laserfiche WebLink
<br />. to <br /> <br />. <br /> <br />7, <br /> <br />8, <br /> <br />9, <br />10, <br /> <br />II. <br /> <br /> 12. <br /> 13, <br /> 14, <br /> 15, <br />e 16, <br /> 17, <br /> 18, <br /> <br />The applicant shall maintain a roadway width of 40 feet nntil just nortb of <br />the private acccss drive where the roadway width can taper down to the <br />proposed 28 feet width. <br />Detailed final grading, utility, drainage, and erosion control plans shall be <br />submitted to the City Engineer for approval prior to issuance of a building <br />permit. <br />Compliance with the applicable provisions of the Zoning Ordinance, <br />Any applicable permits shall be filed with Ramsey County, the Rice Creek <br />Watershed District, the Minnesota Pollution Control Agency, and other <br />regulatory agencies. <br />The applicant shall comply with section 507 of the International Building <br />Codc requirements for Unlimited Area Buildings, which states that the <br />applicant shall maintain a 60-foot clearance around the entire perimeter of <br />the building or meet the requirements in section 507,4 for reduced open <br />space, <br />The applicant shall loop together the water mains from the east and west. <br />The applicant shall provide the City with an elevation of the north side of <br />the Sheriff Patrol Vehicle Storage area, <br />The applicant shall provide emergency exits from the Sheriff Patrol <br />Vehicle Storage area to the outside, <br />The applicant shall verify the exit/entrance into the Sheriff Patrol Vehicle <br />Storage are and main Sheriff Patrol building per approval of the Fire <br />Marshal. <br />Thc applicant shall locate the Fire Department Control (F,D,C,) on the <br />front (East) side of the building, <br />The applicant shall locate a fire hydrant within 150 feet of the Fire <br />Department Control (F,D,C.), <br />The applicant shall keep assembly occupancy separated from other <br />occupancies by one (I) hour fire walls, <br /> <br />Deadline for Al!ency Actions <br /> <br />The City of Arden Hills received the completed application for this request on September <br />9, 2003, Pursuant to Minnesota State Statue, the city must act on this request by <br />November 10, 2003 (60 days), unless the City provides the petitioner with written <br />reasons for an additional 60 day review period, The city may with the petitioner's <br />consent extend the review period beyond the 120 days, <br /> <br />Attachments <br /> <br />. <br /> <br />6B -I <br />6B - 2 <br />6B - 3 <br /> <br />Planning Commission Report - October I, 2003 <br />Planning Commission Minute Excerpt - October 1,2003 <br />Revised Sheriffs Station Parking Lot Layout <br /> <br />PC #03-26 - CC Report 10/27/03 - Page 3 of3 <br />