My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-27-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 10-27-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:43 PM
Creation date
11/14/2006 2:38:03 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Mr. Bruce Thompson <br /> <br />- 2- <br /> <br />September 8, 2003 <br /> <br />a,m, peak hour, There is no shift change during the p,m, peak hour. However, it was assumed <br />Ihat all employees working in the field will make a tl1p to and from this office during the p,m, <br />peak hour. <br /> <br />Table 1 <br />Trip Generation Estimates <br /> <br />Land Use Daily A.M. Peak P.M. Peak <br /> In Out In Out <br />Proposed Development <br />Ramsey County Sheriff's Department 300 61 23 13 13 <br /> <br />The same directional trip distribution used in the previous memorandum was assumed for the <br />proposed site-generated trips, The combination of background traffic, trips generated for the <br />proposed developments from the previous memorandum and trips generated for the proposed.; <br />Sheriff's Administration building is shown in Figure 1 for year 2005, for the a,m. and p,m. peak <br />hours, <br /> <br />2005 Build Traffic Operations Analysis <br /> <br />To determine how well the existing roadway system will accommodate the proposed <br />development, a traffic operations analysis was conducted for the a.m, and p,m, peak hours for <br />year 2005, Future operations analysis assumptions from the previous memorandum were <br />assumed for this analysis as well. <br /> <br />Summary and Conclusions <br /> <br />Results from the analysis indicate that the additional trips generated by the Ramsey County <br />Sheriff's Administration building will not have a significant impact on the adjacent roadways, <br />and the level of service results and recommendations will remain as stated in the previous <br />memorandum, <br />
The URL can be used to link to this page
Your browser does not support the video tag.