Laserfiche WebLink
<br />I <br />Ie <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />-- <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br /> <br />City of Arden Hills <br />2004 PMP <br /> <br />Shoreline Lane (South of Edgewater) . Roadway Quantities <br /> <br />Full Reconstruct, 280 FT <br /> <br />ITEM NO. ITEM DESCRIPTION UNIT CONTRACT UNIT COST PROJECT COST <br />QUANTITY <br />1 MOBILIZATION LS 1.0 $1.676.29 $1,676 <br />2 SAWCUT BITUMINOUS PAVEMENT(FULL DEPTH) LF 23 $4.00 $92 <br />3 SAWCUTCONCRETEPAVEMENT LF 56 $6.00 $336 <br />4 REMOVE BITUMINOUS PAVEMENT SY 690 $2.00 $1,380 <br />5 REMOVE BIT DRIVEWAY SY 32 $3.00 $97 <br />6 REMOVE CONC DRIVEWAY SY 85 $3.00 $255 <br />7 REMOVE GRAVEL DRIVEWAY SY 58 $1.50 $86 <br />8 REMOVE AND REPLACE MAILBOX EA 5 $50.00 $250 <br />9 COMMON EXCAVATION CY 585 $7.00 $4,095 <br />10 SELECT GRANULAR BORROW CY 292 $13.50 $3,942 <br />11 AGGREGATE BASE CLASS 5 CY 183 $21.00 $3,843 <br />12 2" TYPE LV3 WEARING COURSE TON 78 $38.00 $2,964 <br />13 2" TYPE LV3 NON.WEARING COURSE TON 78 $35.00 $2,730 <br />14 4" PERF. DRAIN PIPE LF 100 $5.00 $500 <br />15 BIT DRIVEWAY SY 30 $25.00 $750 <br />16 CONC DRIVEWAY SY 82 $40.00 $3,280 <br />17 GRAVEL DRIVEWAY SY 55 $15.00 $825 <br />18 TACK COAT GAL 34 $2.25 $77 <br />19 CURB AND GUTTER LF 600 $9.50 $5,700 <br />20 SOD WITH 4" TOPSOIL AND FERTILIZER SY 588 $3.00 $1,764 <br />21 STREET CLEANING HR 2 $100.00 $200 <br />22 WATER FOR DUST CONTROL MGAL 20 $18.00 $360 <br />23 MODULAR BLOCK RETAINING WALL SY 150 $25.00 $3,750 <br /> ESTIMATED CONSTRUCTION COST $38,952 <br /> 10% CONTINGENCY $3,900 <br /> 26% ENGINEERING AND ADMINISTRATION $10,100 <br /> TOTAL COST $53,000 <br />