Laserfiche WebLink
<br />I <br />.. <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />-- <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br /> <br />City of Arden Hills <br />2004 PMP <br /> <br />Shoreline Lane and County Road D Intersection - Roadway Quantities <br />Full Reconstruct, 900 FT <br /> <br /> CONTRACT UNIT COST PROJECT COST <br />ITEM NO. ITEM DESCRIPTION UNIT QUANTITY <br />1 MOBILIZATION LS 1.0 $6,890.92 $6,891 <br />2 CLEARING AC 5 $750.00 $3,750 <br />3 GRUBBING AC 5 $750.00 $3,750 <br />4 REMOVE LANDSCAPING LS 1.0 $2,500.00 $2,500 <br />5 SAWCUT BITUMINOUS PAVEMENT(FULL DEPTH) LF 320 $4.00 $1,280 <br />6 SAWCUT CONCRETE PAVEMENT LF 40 $6.00 $240 <br />7 REMOVE BITUMINOUS PAVEMENT SY 3,133 $2.00 $6,266 <br />8 REMOVE BIT DRIVEWAY SY 323 $3.00 $969 <br />9 REMOVE CONC DRIVEWAY SY 165 $3.00 $496 <br />10 REMOVE GRAVEL DRIVEWAY SY 160 $1.50 $240 <br />11 REMOVE AND REPLACE MAILBOX EA 15 $50.00 $750 <br />12 COMMON EXCAVATION CY 2,103 $7.00 $14,721 <br />13 SELECT GRANULAR BORROW CY 1,051 $13.50 $14,189 <br />14 AGGREGATE BASE CLASS 5 CY 677 $21.00 $14,217 <br />15 2" TYPE LV3 WEARING COURSE TON 300 $38.00 $11,400 <br />16 2" TYPE LV3 NON.WEARING COURSE TON 300 $35.00 $10,500 <br />17 BIT DRIVEWAY SY 323 $25.00 $8,075 <br />18 CONC DRIVEWAY SY 165 $40.00 $6,600 <br />19 GRAVEL DRIVEWAY SY 160 $15.00 $2,400 <br />20 TACK COAT GAL 131 $2.25 $295 <br />21 CURB AND GUTTER LF 1,700 $9.50 $16,150 <br />22 SILT FENCE LF 1,000 $2.00 $2,000 <br />23 REMOVE SILT FENCE LF 1,000 $0.50 $500 <br />24 SOD WITH 4" TOPSOIL AND FERTILIZER SY 3,285 $3.00 $9,856 <br />25 SEED WITH 4' TOPSOIL AND FERTILIZER SY 300 $1.25 $375 <br />26 TEMPORARY ROCK ENTRANCE EA 1 $2,000.00 $2,000 <br />27 STREET CLEANING HR 10 $100.00 $1,000 <br />28 WATER FOR DUST CONTROL MGAL 100 $18.00 $1,800 <br />29 TRAFFIC LOOP FOR SIGNAL LS 1 $8,000.00 $8,000 <br />30 TRAFFIC CONTROL LS 0.5 $7,000.00 $3,500 <br /> ESTIMATED CONSTRUCTION COST $154,709 <br /> 10% CONTINGENCY $15,500 <br /> 26% ENGINEERING AND ADMINISTRATION $40,200 <br /> TOTAL COST $210,000 <br />