Laserfiche WebLink
<br />I <br />Ie <br /> <br /> <br />I URS PROJECT NO. 37951027-0101 <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br /> <br />City of Arden Hills <br />2004 PMP <br /> <br /> DRAINAGE <br /> CONTRACT UNIT COST PROJECT COST <br />ITEM NO. ITEM DESCRIPTION UNIT QUANTITY <br />1 MOBILIZATION LS 1 $7,189.75 $7,190 <br />2 CLEAR AND GRUB AC 0.5 $10,000.00 $5,000 <br />3 POND EXCAVATION CY 2,000.0 $12.00 $24,000 <br />4 REMOVE EXISTING STORM STRUCTURE EA 5 $800.00 $4,000 <br />5 REMOVE EXISTING STORM SEWER LF 175 $10.00 $1,750 <br />6 12" RCP LF 1,207 $25.00 $30,175 <br />7 15" RCP CLASS V LF 390 $28.00 $10,920 <br />8 18" RCP CLASS V LF 135 $32.00 $4,320 <br />9 12" RCP FES WITH TRASH GUARD EA 1 $500.00 $500 <br />10 15" RCP FES WITH TRASH GUARD EA 2 $600.00 $1,200 <br />11 18" RCP FES WITH TRASH GUARD EA 2 $700.00 $1,400 <br />12 24" FES WITH TRASH GUARD EA 1 $1,200.00 $1,200 <br />13 CATCH BASIN (2'x3') EA 6 $1,000.00 $6,000 <br />14 CATCH BASIN MANHOLE. 48" EA 12 $1,450.00 $17,400 <br />15 MANHOLE - 48" EA 1 $3,500.00 $3,500 <br />16 6" HDPE - DIRECTIONAL BORING LF 580 $36.00 $20,880 <br />17 GROUTED RIP RAP CLASS III CY 40 $95.00 $3,800 <br />18 TRENCH STABILIZATION MATERIAL TON 500 $15.50 $7,750 <br /> ESTIMATED CONSTRUCTION COST $150,985 <br /> 10% CONTINGENCY $15,100 <br /> 26% ENGINEERING AND ADMINISTRATION $39,300 <br /> TOTAL COST $205,000 <br />