Laserfiche WebLink
<br />I <br /> <br />.. <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />.. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />.. <br />I <br /> <br />I <br /> <br />City of Arden Hills <br />2004 PM P <br /> <br />Lake Lane (South of Edgewater) - Roadway Quantities <br />Full Reconstruct (Alley Section) 175 LF <br /> <br /> CONTRACT UNIT COST PROJECT COST <br />ITEM NO. ITEM DESCRIPTION UNIT QUANTITY <br />1 MOBILIZATION LS 1 $854.54 $855 <br />2 SAWCUT BITUMINOUS PAVEMENT(FULL DEPTH) LF 25 $4.00 $100 <br />3 REMOVE BITUMINOUS PAVEMENT SY 361 $2.00 $722 <br />4 REMOVE BIT DRIVEWAY SY 73 $3.00 $220 <br />5 REMOVE AND REPLACE MAILBOX EA 1 $50.00 $50 <br />6 COMMON EXCAVATION CY 318 $7.00 $2.226 <br />7 SELECT GRANULAR BORROW CY 146 $13.50 $1.971 <br />8 AGGREGATE BASE CLASS 5 CY 88 $21.00 $1,848 <br />9 6' CONCRETE ALLEY (16' WIDE) SY 165 $35.00 $5.775 <br />10 BIT DRIVEWAY SY 75 $25.00 $1,875 <br />11 SILT FENCE LF 100 $2.00 $200 <br />12 REMOVE SILT FENCE LF 100 $0.50 $50 <br />13 SOD WITH 4' TOPSOIL AND FERTILIZER SY 471 $3.00 $1,414 <br />14 STREET CLEANING HR 1 $100.00 $100 <br />15 WATER FOR DUST CONTROL MGAL 30 $18.00 $540 <br /> ESTIMATED CONSTRUCTION COST $17,945 <br /> 10% CONTINGENCY $1,800 <br /> 26% ENGINEERING AND ADMINISTRATION $4,700 <br /> TOTAL COST $24,000 <br />