Laserfiche WebLink
<br />. <br /> <br />Existing Conditions <br /> <br /> <br />· Co. Rd. E (East side of <br />TH51 Bridge). <br /> <br />. <br /> <br />Co. Rd. E Trail Cost Estimate <br /> <br />· 8' wide bituminous trail: $15,500 <br /> <br />· Bridge Reconfiguration: $77,500 <br />· Grading/Restoration: $22,500 <br /> <br />· Estimated Total:$115,500 <br /> <br />11/11/2003 <br /> <br />. <br /> <br />9 <br />