Laserfiche WebLink
<br />URS <br /> <br />.' <br /> <br />. <br /> <br />November 19.2003 <br /> <br />AGENDA ITEM 8.B <br /> <br />Ms. Michelle Wolfe <br />City Administrator <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: Booster Station Project <br /> <br />Dear Ms, Wolfe, <br /> <br />Bids were received and opened for the above-referenced project on November 13.2003, Bids were received from <br />five (5) contractors, The tabulated bid outcome is as follows: <br /> <br /> Contractor A: Booster Station B: Bid Alternate I Total Amount . <br />I EnCommMidwest, Inc. $161,460,00 $6,980.00 $168,440,00 <br />2. Thor Construction Inc, $163.567,50 $6,500.00 $170,067.50 <br />3. Magney Construction Inc, $180,200,00 $6,600.00 $186,800,00 <br />4. Jay Bros" Inc. $189,769,00 $5,945.00 $195,714,00 <br />5. Hamline Construction $198,500,00 $6,700,00 $205,200,00 <br /> Engineer's Estimate $209,000.00 $7,000.00 $216,000,00 <br /> <br />AIl bids, except for one, had proper bid guarantees in the amount of ten percent (10%) of the total bid as required <br />by the Project Manual, Jay Bros., Inc, provided a bid guarantee in the amount of five percent (5%) of the total bid, <br />Hamline Construction did not properly fiIl out the Bid Form in that they did not provide Unit Prices, so their Bid <br />was deemed nonresponsive, All Bidders acknowledged that they received Addendum 1. A copy of the bid <br />tabulation is attached for your information, <br /> <br />EnComm Midwest, Inc, submitted the low bid with a total bid amount of $168,440.00, including Bid Alternate 1. <br />In terms of Schedule A: Booster Station, EnComm Midwest, Inc. submitted the low bid of $161,460.00 which is <br />$47,540 (23%) less than the Engineer's Estimate, The average bid for Schedule A is calculated to be $178,699.30, <br />which is $30,300,70 (15%) lower than the Engineer's Estimate, The Engineer's Estimate generally was higher with <br />respect to the electrical work items proposed for the Booster Station, We feel that receiving five Bids, all within <br />$37.000 of each other, reflects good interest in this project resulting in a very competitive bid for the work, <br /> <br />The Bid Alternate I work includes furnishing and installing a 16' X 16' Roll Garage Door for the adjacent Water <br />Tower utilizing the existing operator, All five bids for this work came in right at or a little below the Engineer's <br />Estimate, <br /> <br />. <br /> <br />Thresher Sqaare. 700 Third Street South' Minneapolis, MN 55415' Phone: (612) 370-0700' Fax: (612) 370-1378 <br />