My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-08-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 12-08-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:51 PM
Creation date
11/14/2006 2:38:36 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Site Data <br /> <br /> <br />IND: Industrial <br />LI: Light Industrial <br />I-I: Light Industrial <br />.65 acres (28,335 square feel) <br />Generally FIat <br /> <br />Background <br /> <br />The City has recently reviewed the following requests for Ihis property: <br /> <br />Planning Request Comments CC Action <br />Case <br />02-01 SUP Amendment 3 Additional Antennas 03/06/2002 (A) <br /> <br />The original lease between the City and Cellular One was signed on April 18, 1989. AT&T has <br />since acquired Cellular One and currently has 9 antennas on the Fernwood Water Tower. The <br />most recent action was a SUP Amendment in 2002 which increased AT&T's number of antennas <br />from 6 to 9. The proposed amendment would increase the number of AT&T antennas on the <br />water tower to 10. An executed copy of the Special Use Permit from Planning Case 02-01 has <br />been attached for your reference. <br /> <br />Site Plan Review <br /> <br />The following provides an evaluation of related requirements based on the attached plan set: <br /> <br />1. Zoning - Code Requirements Met. <br /> <br />A dish or tower antenna is allowed after the issuance of Special Use Permit (Special <br />Accessory Use) in the I-I: Limited Industrial zoning district. <br /> <br />2. Design / Aesthetics - Code Requirement Met. <br /> <br />The current lease agreement states that antennas and all mounts shall be painted to match the <br />color ofthe tower. <br /> <br />3. Construction / Structural - Additional Information Required. <br /> <br />The City Engineer had concluded that additional structural work should be submitted <br />including information on the structural steel partieular to this installation, reference numbers <br />for building and electrical codes, and a mounting detail. Staff has included a condition of <br /> <br />\\Earth\Planning\Planning Cases\200J\03-30 AT&T_ATC Tower SUP Amendment (Pending)\12-03.03 PC Report.doc Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.