Laserfiche WebLink
<br />. <br /> <br />Antennas shall not be located nearer to any property line than the height of the <br />~am~ . <br /> <br />Screening <br />- Screening shall be provided so as to prevent direct view of a dish antenna <br />from any street or from a public or private property within six hundred (600) <br />feet of the dish and screened in accmdance with section 6, E, 4, <br /> <br />The applicant's plans indicate that the roof area where the satellite is proposed for is 32 feet <br />above grade. The parapet wall is 34 feet above grade. Therefore the satellite may require <br />screening to hide the additional height in accordance with Section 6, E, 4. of the Zoning <br />Ordinance. <br /> <br />3. Special Use Permit Analysis - Finding Required <br /> <br />General Requirements <br /> <br />Section 8, D, 3, b ofthe Arden Hills Zoning Ordinance states the City Council and Planning <br />Commission: <br /> <br />",.,shall consider the effect of the proposed use upon the health, safety, convenience and <br />general welfare of the owners and occupants of surrounding land, in particular, and the <br />community as a whole, in general, including but not limited to thefollowingfactors: <br />existing and anticipated traffic and parking conditions; noise, glare, odors, vibration, . <br />smoke, dust, air pollution, heat, liquid or solid waste, and other nuisance characteristics; <br />drainage; population density; visual and land use compatibility with uses and structures <br />on surrounding land; adjoining land values; park dedications where applicable, and the <br />orderly development of the neighborhood and the City within the general purpose and <br />intent of this ordinance and the Comprehensive Development Plan for the City. " <br /> <br />The Planning Commission must make a finding as to whether or not the proposed <br />Special Use Permit would adversely affect the surrounding neighbmhood and <br />larger community as per the aforementioned factors. <br /> <br />4. Plan Review Comments <br /> <br />A. Building Permit Plans shall be submitted to the Building Official a minimum of two (2) <br />weeks before the planned start of construction. <br />B. No construction shall begin before plans are approved by the City of Arden Hills' <br />Building Official. <br /> <br />Staff Findine-s and Recommendation <br /> <br />\\Earth\Planning\Planning Cases\2004\04~13 Guidant through NCS - SUP for satellite antennae on Building L (PENDING)\07-07-04 PC Report . <br />Guidant through NCS SUP for satellite on Building L.doc <br /> <br />Page 4 of5 <br />