Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />URS <br /> <br />Agenda Item 2E <br /> <br />MEMORANDUM <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612)370-1378 <br /> <br />To: <br /> <br />Ms. Michelle Wolfe! <br />City of Arden Hills <br /> <br />Copy: <br /> <br />Nick LandwerlURS <br />Tom Moore/AH <br /> <br />File: <br /> <br />37951-023-8001 <br /> <br />From: <br /> <br />Greg Brown <br />Arden Hills City Engineer <br /> <br />Date: <br /> <br />February 11, 2004 <br /> <br />Subject: <br /> <br />County Road E Pedestrian Improvemeuts <br /> <br />Background <br />The Council authorized the City Engineer to prepare a feasibility report for pedestrian sidewalk <br />improvements to County Road E at the January 26,2004 Meeting. The general scope of the <br />improvements includes widening of the pedestrian walk along the County Road E bridge across <br />TH 51 and construction of an at grade sidewalk from the signalized intersection east ofthe <br />bridge to the intersection of County Road E and Old Highway 10. Weare developing a series of <br />options for the bridge crossing for council's consideration and will discuss them in greater detail <br />at the work session. Below is a general summary of the options we are developing: <br /> <br />Option A: <br />· Replace existing bridge north sidewalk and guardrail with F-type rail (I' -8" wide vs. 3' -8") <br />· Shift roadway centerline 3' to the north <br />. Narrow traffic lanes to 14' (currently 15') <br />· Construct 6' -6" foot walk along the south side of bridge <br />· Estimated bridge construction cost: $60,000 <br /> <br />Option B: <br />· Replace existing bridge north sidewalk and guardrail with F-type rail (I' -8" wide vs. 3' .-8") <br />. Shift roadway centerline 3' to the north <br />. Narrow traffic lanes to 14 ' (currently 15 ') <br />· Construct 7'-6" foot walk along south side of bridge with cantilever structure improvements <br />to bridge beams <br />· Estimated bridge construction cost: $80,000 <br />