My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-08-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 03-08-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:25 PM
Creation date
11/14/2006 3:34:04 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />~. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~ <br /> <br />I <br /> <br />III. Proposed Bridge Improvements <br /> <br />We have evaluated three options to provide a wider sidewalk across the bridge ranging from 6.5 <br />feet to 10 feet in width. The following are brief descriptions along with illustrations and <br />estimated costs. <br /> <br />A. Bridl!c Ontion A: 6.5 Foot Sidewalk <br /> <br />This option is intended to create a wider sidewalk along one side of the bridge without expanding <br />the width of the existing bridge. This is accomplished through doing the following: <br /> <br />. Replacing the north bridge rail system (currently 3.67 feet wide) with a newer F-type rail <br />design (1.67 feet wide). <br />· Shifting the centerline of County Road E 3 feet - This would require restriping with some <br />curvature on either side of the bridge to move traffic back to the proper alignment for the <br />signalized intersections. <br />. Narrowing the traffic lanes from 15 feet to 14 feet in width (Ramsey County has agreed to <br />this in concept)Removal of the south bridge rail system and construction of a new 6.5 foot <br />sidewalk and outside barrier made of concrete and fencing. <br /> <br />15' <br /> <br />Bridge Rail & walk ta <br />15' be remaved (bath sides) <br /> <br />I <br /> <br /> <br /> <br /> <br />7. Existing Cross Section of County Road E Bridge <br /> <br />Vin)'f coated <br />chain link <br />fence (72") <br /> <br />6.5' <br /> <br />14' <br /> <br />14' <br /> <br />Cone. Railing <br />Type P-l <br /> <br />, <br />r-~ Co. Rd. E <br />i (Shifted) <br /> <br />, <br /> <br />Cone, Railing <br />Type F <br /> <br /> <br />8. Proposed Cross Section of County Road E Bridge- Option A <br /> <br />The Estimated Project Cost for this Option is $60,000 <br /> <br />8 <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.