Laserfiche WebLink
<br />I <br />I. 3/112004 <br />I <br />I <br />, <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,. <br />I <br /> <br />CITY OF ARDEN HIllS <br />COUNTY ROAD E PEDESTRIAN WALK <br /> <br />PRELIMINARY CONSTRUCTION COSTS <br /> <br /> 6' Bituminous Walk <br />Item No. Item Units Quantitv Unit Price Amount <br />1 6' Bit Trail (includes base) SF 11250 $ 2.50 $ 28,100.00 <br />2 Sod LS I $ 4,000.00 $ 4,000.00 <br />3 Grading (6' wide) LF 1875 $ 2.50 $ 4,700.00 <br />4 Ped Ramp EA 4 $ 500.00 $ 2,000.00 <br />5 Striping Changes (E) LS 1 $ 2,000.00 $ 2,000.00 <br />6 Mobilization LS 1 $ 2,500.00 $ 2,500.00 <br />7 Concrete Curb (hand formed) LF 80 $ 25.00 $ 2,000.00 <br /> Construct Subtotal $ 45,300.00 <br /> 20% Engineering & Construction Administration $ 9.100.00 <br /> Total Project Cost $ 54,400.00 <br />