Laserfiche WebLink
<br />I <br /> <br /> <br />I. 3/1/2004 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,. <br />I <br /> <br />CITY OF ARDEN HILLS <br />COUNTY ROAD E PEDESTRIAN WALK <br /> <br />PRELIMINARY CONSTRUCTION COSTS <br /> <br /> 6' Concrete Walk <br />Item No. Item Units Ouantity Unit Price Amount <br />1 6' Concrete Trail (includes base) SF 11250 $ 4.30 $ 48,400.00 <br />2 Sod LS 1 $ 4,000.00 $ 4,000.00 <br />3 Grading LF 1875 $ 2.50 $ 4,700.00 <br />4 Ped Ramp EA 4 $ 500.00 $ 2,000.00 <br />6 Striping Changes (E) LS 1 $ 2,000.00 $ 2,000.00 <br />7 Mobilization LS 1 $ 2,500.00 $ 2,500.00 <br />8 Concrete Curb (hand formed) LF 80 $ 25.00 $ 2,000.00 <br /> Construct Subtotal $ 65,600.00 <br /> 20% Engineering & Construction Administration $ 13,100.00 <br /> Total Project Cost $ 78,700.00 <br />