Laserfiche WebLink
<br />I <br /> <br /> <br />I. 3/112004 <br /> <br />I <br />I <br />. <br />I <br />. <br />I <br />. <br />.. <br />I <br />. <br />. <br />I <br />I <br />I <br />. <br />.. <br />I <br /> <br />CITY OF ARDEN HILLS <br />COUNTY ROAD E PEDESTRIAN WALK <br /> <br />PRELIMINARY CONSTRUCTION COSTS <br /> <br /> 8' Bituminous Walk <br />Item No. Item Units Ouantity Unit Price Amount <br />1 8' Bit Trail (includes base) SF 15000 $ 2.50 $ 37,500.00 <br />2 Sod LS 1 $ 4,000.00 $ 4,000.00 <br />3 Grading LF 1875 $ 3.25 $ 6,100.00 <br />4 Ped Ramp EA 4 $ 500.00 $ 2,000.00 <br />6 Striping Changes (E) LS 1 $ 2,000.00 $ 2,000.00 <br />7 Mob LS 1 $ 4,000.00 $ 4,000.00 <br />8 Concrete Curb (hand formed) LF 80 $ 25.00 $ 2,000.00 <br /> Construct Subtotal $ 57,600.00 <br /> 20% Engineering & C~nstruction Administration $ 11,500.00 <br /> Total Project Cost $ 69,100.00 <br />