My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-08-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 03-08-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:25 PM
Creation date
11/14/2006 3:34:04 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br /> <br />I. 3/112004 <br /> <br />I <br />I <br />. <br />I <br />. <br />I <br />. <br />.. <br />I <br />. <br />. <br />I <br />I <br />I <br />. <br />.. <br />I <br /> <br />CITY OF ARDEN HILLS <br />COUNTY ROAD E PEDESTRIAN WALK <br /> <br />PRELIMINARY CONSTRUCTION COSTS <br /> <br /> 8' Bituminous Walk <br />Item No. Item Units Ouantity Unit Price Amount <br />1 8' Bit Trail (includes base) SF 15000 $ 2.50 $ 37,500.00 <br />2 Sod LS 1 $ 4,000.00 $ 4,000.00 <br />3 Grading LF 1875 $ 3.25 $ 6,100.00 <br />4 Ped Ramp EA 4 $ 500.00 $ 2,000.00 <br />6 Striping Changes (E) LS 1 $ 2,000.00 $ 2,000.00 <br />7 Mob LS 1 $ 4,000.00 $ 4,000.00 <br />8 Concrete Curb (hand formed) LF 80 $ 25.00 $ 2,000.00 <br /> Construct Subtotal $ 57,600.00 <br /> 20% Engineering & C~nstruction Administration $ 11,500.00 <br /> Total Project Cost $ 69,100.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.