My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-29-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 03-29-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:28 PM
Creation date
11/14/2006 3:34:25 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br /> <br /> - Pro Dosed at Shortest Point <br />MJIILlIllI.m Buildinl! Setbacks Required <br />FrotltXard (Cleveland) 20 Feet 116 Feet <br />Rear Yard 20 Feet 30 Feet <br />Sidc Y ard- Interior 5 Feet 30 Feet <br />Side Yard-Comer 20 Feet 20 Feet <br /> --~--_.__. <br /> <br />. <br /> <br />2. Buildiug Area / Floor Area Ratio - Meets requirement. <br /> <br />The floor area ratio requirement for the NB Neighborhood Business District is 0.7. The <br />proposal shows a floor area ratio of 0.22, <br /> <br />(Square Feet) <br />23,100 <br /> <br /> <br />(Square Feet) <br />7,368 <br /> <br /> <br />(%) <br />70% Max <br /> <br />(%) <br />22% <br /> <br />3. Lot Covered by Sh'ucture - Does not meet requirement. <br /> <br />The Lot Covered by Structure requirements includc the space covered by the principal <br />and accessory buildings. Since the principal building is a one-story structure the lot <br />covered by structure figure and floor area ratio figure are virtually identical (the trash <br />enclosure was included in the lot covered by structure figure). . <br /> <br /> <br />(Square Feet) (%) <br />7,488 23% <br /> <br />4. Height - Meets Code Requirement <br /> <br />The maximum building height allowed in the Neighborhood Business District is 35 feet. The <br />proposed elevations show a building hcight of29 feet at the highest point of the building. <br /> <br />5. Landscape Lot Area, Landscaping - Landscape area requirement met; Landscaping <br />requirements not met, <br /> <br />The landscape area requiremcnt for the NB district states that a minimum of 35% of the <br />property should be kept as landscape area. The proposed development significantly exceeds <br />the requiremcnts by having 61 % of the propeliy as landscape area. <br /> <br />\\Earth\Planning\Planning Cases\2004\04-06 MSP Master and Final PUD for Cleveland and County Road D (PENDING)\03-03-04 PC Report <br />MSP .doc <br /> <br />Page 4 of 10 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.