My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-29-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 03-29-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:28 PM
Creation date
11/14/2006 3:34:25 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-'\ <br /> <br />} <br /> <br />. 13. Additional Neighborhood Business Requirements <br /> <br />. <br /> <br />. <br /> <br />. The Neighborhood Business District requires that sidewalks be put in placc along public <br />rights of way. An existing bituminous trail currently runs North/South on Cleveland <br />Avenue. Thcre is currently no sidewalk running East/West on County Road D. <br />According the Park and Recreation Director, this is a planned trail cOtmection. In <br />Planning Cases #01-31 and #02-20 the property owner was required to install a new <br />publicly dedicated 6-fool wide trail adjacent to the right-of-way on County Road D and <br />replace the existing 6-foot wide trail along County Road D and have the trails connect at <br />the intersection. Thc applicant has proposed a 5-foot concretc walk along County Road <br />D. Staff would recommend that the applicant install new trails as was previously <br />contemplated in Platming Cases #01-31 and #02-20. <br /> <br />. This area is designated as a community "Gateway" to the City of Arden Hills. The <br />applicant has agreed to provide a 15' x 15' easement at the intcrsection of County Road <br />D and Cleveland for Gateway signage purposes. <br /> <br />Staff Recommendation <br /> <br />In Planning Case #04-06 staff recommends approval ofthe Master and Final Plan PUD subject <br />to the following conditions: <br /> <br />I, Building Permit Plans shall be submitted to the Building Official a minimum of two (2) <br />wccks before the planned start of construction. <br />2. No construction shall begin before plans are approved by the City of Arden Hills' <br />Building Official. <br />3. The building and attic shall be sprinkled. <br />4. The applicant shall submit a landscape performance bond or other surety for 125% of the <br />cost of matcrials and installation valid one full year from the date of installation prior to <br />the issuance ofa building permit. <br />5. The applicant shall obtain all necessary permits from the Rice Creek Watcr Shcd District <br />and Ramscy County. <br />6, The concrete curb and walk at the front entry to the building shall include an ADA <br />compliant curb cut and ramp. <br />7, Decorative lighting as approved by City staff shall be required for parking lot lighting. <br />8. Two freestanding monument style signs, not to exceed 60.5 total square feet total, shall <br />be allowed on the propcrty. The signs shall be located so that a clear vision triangle is <br />maintained. <br />9. A revised grading and drainagc plan responsive to the issues outlined in the February 17, <br />2004 Memo from City Enginecr bc submittcd to the City Engineer for his approval. <br /> <br />\\Farth\Planlling\Planning Cases\1004\04-06 MSP Master and Final PUD for Cleveland and County Road J) (PENDTNG)\03-03-04 PC Report <br />MSP_doc <br /> <br />Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.