Laserfiche WebLink
<br />CIP Memorandum <br />Apri114,2002 <br />Page 3 <br /> <br />. <br /> <br />The maero analysis indicates that current funding stream is adequate to fund the eurrent PMP <br />needs. In addition to the funding stream, a substantial amount of capital reserves have been <br />accumulated by the City as a result of low investments in the PMP from 1999-2002, The current <br />audit will identify the exaet amount of funds eurrently in reserve and available to fund PMP <br />improvements projects. <br /> <br />Proposed PMP Improvements <br />We have developed a proposed PMP Improvements Schedule (attached) to address sealcoating, <br />overlay, drainage and reconstruction work throughout the City. The improvements projects are <br />based upon the neighborhood approaeh as has been endorsed by the Couneil in the fall of 200 I, <br />The proposed project scopes are within budget parameters outlined above and reflect a higher <br />early investment in reconstruction to get ahead of the pavement failure curve, Our overall <br />ranking of neighborhoods is similar to the priorities developed in 1999 and 2002 during <br />previous reviews of the City's pavement and drainage infrastructure, Our basis for prioritizing <br />neighborhoods involves the consideration of several faetors including: <br />PCI values for neighborhood streets <br />Condition/effectiveness of existing surface drainage system (or lack thereof) <br />Condition of underground water and sanitary sewer utilities, need for dig-up repairs <br />Whether neighborhood streets meet City standards . <br />Whether neighborhood streets have eoncrete curb and gutter <br />Opportunity for significant improvement of water quality of neighborhood runoff <br />Available State Aid and City funding <br />Emergency Issues <br />County construction projects on adjacent roadways <br />Major development/redevelopment projects <br />Neighborhood petitions <br />Opportunities to include planned trail improvements (per PTRC) with roadway <br /> <br />Work Session <br />The proposed CIP improvements including PMP, trails, watermain, sanitary sewer, and storm <br />sewer for 2005 .-- 2009 will be presented to the Council for discussion and input at the <br />worksession. The CIP will be revised as necessary following the Work Session and issued as a <br />report in the near future. <br /> <br />. <br />