My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-19-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 04-19-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:30 PM
Creation date
11/14/2006 3:34:43 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />CIP Memorandum <br />Apri114,2002 <br />Page 3 <br /> <br />The macro analysis indicates that current funding stream is adequate to fund the current PMP <br />needs. In addition to the funding stream, a substantial amount of capital reserves have been <br />accumulated by the City as a result of low investments in the PMP from 1999-2002. The eurrent <br />audit will identify the exact amount of funds currently in reserve and available to fund PMP <br />improvements projects. <br /> <br />Proposed PMP Improvements <br />We have developed a proposed PMP Improvements Schedule (attached) to address sealeoating, <br />overlay, drainage and reconstruetion work throughout the City. The improvements projects are <br />based upon the neighborhood approach as has been endorsed by the Council in the fall of 200 I. <br />The proposed project scopes are within budget parameters outlined above and reflect a higher <br />early investment in reconstruction to get ahead of the pavement failure curve, Our overall <br />ranking of neighborhoods is similar to the priorities developed in 1999 and 2002 during <br />previous reviews of the City's pavcment and drainage infrastructure. Our basis for prioritizing <br />neighborhoods involves the consideration of several factors including: <br />PCI values for neighborhood streets <br />Condition/effectiveness of existing surface drainage system (or lack thereof) <br />Condition of underground water and sanitary sewer utilities, necd for dig-up repairs <br />Whether neighborhood streets meet City standards <br />Whether neighborhood streets have eonerete curb and gutter <br />Opportunity for significant improvement of water quality of neighborhood runoff <br />Available State Aid and City funding <br />Emergency Issues <br />County construetion projects on adjacent roadways <br />Major development/redevelopment projects <br />Neighborhood petitions <br />Opportunities to include planned trail improvements (per PTRC) with roadway <br /> <br />Work Session <br />The proposed CIP improvements including PMP, trails, watermain, sanitary sewer, and storm <br />sewer for 2005 - 2009 will be presented to the Council for discussion and input at the <br />worksession. The CIP will be revised as neeessary following the Work Session and issued as a <br />report in the near future. <br />
The URL can be used to link to this page
Your browser does not support the video tag.