My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-17-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 05-17-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:32 PM
Creation date
11/14/2006 3:34:54 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />City of Arden Hills <br />2004 Assessment Policy <br /> <br />Street Reconstruction <br /> <br />a. Residential Equivalent Assessment Rate <br />All R-l and R-2 residentially zoned propertics with frontage abutting <br />a street that is reconstructed shall be assessed on a per unit basis at the <br />residcntial equivalent assessment rate. <br /> <br />This rate shall apply, rcgardless of the street's classification (local, <br />collector, arterial, trunk highway); designation (County State-Aid <br />Highway, Municipal State-Aid Street); or jurisdiction (State, County <br />or City). <br /> <br />The residential equivalent assessment rate shall be bascd on fifty <br />percent (50%) of the total cost of strcct rcconstruction, including all <br />associated overhcad costs for a typical residential street section. This <br />residential cquivalent assessme rate shall be determined by the City <br />Council, and established by r lution on an annual basis, based upon <br />comparable project data aval!J the City. <br /> <br /> <br />b. Commercial Equiva <br />Classifications Assess <br />Commcrcial proJl <br />reconstructed sha <br />commercial/industri . <br />calculated b <br />a mixed <br /> <br />.ssessment Rate/All Other Zoning <br />ate <br />frontage abutting a street that is <br />"~sed on a per unit basis at the <br />ivalent assessment rate. The pcr unit basis is <br />verage neighborhood unit size, particularly in <br />d commercial) neighborhood. Larger sized <br />ay be sub-divided into smallcr units for assessment <br />ure equity. <br /> <br />This apply, regardless of the street's classification (local, <br />collector, crial, trunk highway); designation (County State-Aid <br />Highway, Municipal State-Aid Street); or jurisdiction (State, County <br />or City). <br /> <br />The commercial/industrial equivalent assessment rate shall be based <br />on seventy percent (70%) of the cost of street reconstruction plus all <br />associated overhead costs for a typical commcrcial street section. This <br />commercial/industrial equivalent assessmcnt rate shall be determined <br />by the City Council, and cstablishcd by resolution on an annual basis, <br />based upon comparablc project data available to the City. <br /> <br />Mill and Overlav Improvements <br /> <br />Mill and overlay improvcmcnts arc placed as a cost-effective measure to <br />extend the useful street life of a particular roadway and to delay street <br /> <br />2004 Assessment Policy Manual - Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.