My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-17-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 05-17-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:32 PM
Creation date
11/14/2006 3:34:54 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />City of Arden Hills <br />2004 Assessment Policy <br /> <br />remaining after said deductions will be assessed on a gross area basis to all <br />propertied within thc Service District, and will be known as a trunk <br />assessment and/or subtrunk assessment. <br /> <br />3. <br /> <br />Sanitarv Sewer Lateral Rates <br />The building servicc assessments described below will be deducted from <br />the total improvement cost to be assessed. The amount remaining after <br />said deductions will be assessed by the following method. The resulting <br />assessment will be known as a lateral benefit assessment. <br /> <br />Each assessable unit shall be assessed as follows: <br /> <br />. R-l and R-2 residential lots at 100% of the total proiect cost <br />. All other land uses at 100% of tbe total proiect cost <br /> <br />A. <br /> <br /> <br />4. <br /> <br /> <br />The assessment rate for e <br />inch (6"), or eight inch (8 <br />associated with cach. of s <br />services constructed. <br />each sizc and nu <br />building scrvic <br /> <br />of building service; four inch (4"), six <br />Il be determined by adding all the costs <br />. e and dividing by the total number of <br />ill be assessed at the determincd rate for <br />ices installed. This will be known as the <br /> <br />TRIBUTION SYSTEM <br /> <br />1. Water Source and Treatment Facilities <br />The City of Arden Hills purchases water from the City of Roseville to <br />supply the water distribution system. Water enters the system at three (3) <br />separate meter stations. <br /> <br />The water purchased from RosevilIe is treated, and Arden Hill does not <br />add any water treatment to thc distribution system. <br /> <br />2. Water Storage Facilities <br />The City of Arden Hills has a total watcr storage capacity of 1.5 million <br />gallons comprised by two (2) clevatcd storage tanks. One tank has a <br />capacity of 1.0 million gallons and is located south ofl-694 along Red Fox <br />Road. The other storage tank has a capacity of 0.5 million gallons and is <br />located north ofl-694 along Fernwood Avenue. <br /> <br />2004 Assessment Policy Manual- Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.