My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-24-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 05-24-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:34 PM
Creation date
11/14/2006 3:34:56 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br /> <br /> <br />Public and Institutional <br />Institutional <br />B-1: Limited Business District <br />201.92 acres (8,795,635 sq. ft.) including lake /160.14 acres (6,975,698 sq. ft.) <br />201.92 acres (8,795,635 sq. ft.) including lake /160.14 acres (6,975,698 sq. ft.) <br /> <br /> <br />The City has reviewed the following requests for this property: <br /> <br />Planning Request Comments Council Action <br />Case <br /> Special Use Permit <br />04-02 Amendment / Sile Plan New Sophomore Dorm 03/29/2004 (A) <br /> Review <br />02-10 Sile Plan Review Amendment to Ona Orth 6/18/2002 (A) <br />Site Plan <br />00-01 Special Use Permil Ona Orth Athletic 2/14/2000 (A) <br />Complex <br /> Special Use Pennit Traffic Generation <br />98-07 Amendment / Sile Plan Numbers 10/26/1998 (A) <br /> Review <br />96- 26 Special Use Permit Master Plan Amendment 1/2/1997 (A) <br />Amendment <br /> <br />Special Use Permit (SUP) Master Plan Amendment for temporarv modular classroom <br />buildinf! <br /> <br />. <br /> <br />The applicant is proposing 10 install five modular unils which would create one building 10 serve <br />as classroom space on the campus until the Student Life Center Building has been constructed. <br />The temporary modular classroom building would conlain a central corridor and four 50 seat <br />classrooms. The plans provided by the applicanl show the building is not connected to the <br />Robertson Cenler (the brick building directly 10 the south of the proposed temporary building) <br />and that bolh the easl and west ends of the building would have stairs and ramps 10 access the <br />building. Trees would need 10 be removed and retaining walls would need to be constructed 10 <br />the east and west of the building. The applicant has indicated in their lelter thallhe site would be <br />planted with new landscaping after the temporary building was removed. The applicant also <br />indicated in their application Ihat the temporary building would be removed when Ihe Sludent <br />Life Center Building is construcled. There is no set construction schedule for the Student Life <br />Center, but Ihe applicant has stated that it may lake up to seven (7) years before the new building <br />is ready. This assumes that the funding for the building can be raised in five (5) years and <br />conslruction would lake no more than two (2) years. <br /> <br />\\Earth\Planning\Planning Cases\2004\04-10 Bethel SUP Amendment for Temporary Classrooms (PENDING)\05-05-04 PC Report Bethel SUP <br />Amendment Tempomry Classrooms.doc <br /> <br />Page 2 of6 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.