My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-21-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 06-21-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:36 PM
Creation date
11/14/2006 3:35:27 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />Purchased AED's- We have purchased 2 additional Automatic External <br />Defibrillators for the Chief and Deputy Chiefs vehicles. We now have a total of <br />6 AED' s, one at each station on the I st response engine. Grant money was used to <br />purchase 3 of the 6 defibrillators_ <br /> <br />. <br /> <br />Station 3 & 4 Additions- We are in the process of designing additions to the two <br />Shoreview stations. Station 3 which is the headquarters is going to add office <br />space for the full-time staff. Station 4 will be adding office space along with an <br />additional apparatus bay. Station 4 is where our Duty Crew operates out of <br />during the weekdays. <br /> <br />. <br /> <br />Name and Address Change- We have officially changed the legal name of our <br />Department from "Lake Johanna Volunteer Fire Department" to "Lake Johanna <br />Fire Department". Our mailing address for Station 3 (headquarters) will change <br />as a result of the new County Road I reconstruction. <br /> <br />. <br /> <br />Additional Engine- We are still in need of an additional rated engine at Station I. <br />It is important to have a second truck that can carry hose, water, equipment and <br />firefighters to the scene. Currently the 2nd truck at station I does not have a <br />pump; carry water or hose. We are in the process of working with the Board of <br />Directors to devclop a plan. We believe that we can purchase a good used engine <br />for $125,000 to $200,000; this truck would be kept in service for at least 10 years. <br /> <br />. <br /> <br />Station 1 Replacement- this station was built in 1947, with an addition in 1987. <br />It is important that the City of Arden Hills and the fire department both agree on <br />when this station is to be replaced. We would like to see this station get replaced <br />within the next 10 years. Today's cost for a new station would be in the area of <br />$1.5 to $1.8 million dollars. <br /> <br />· Fire Marshal's Position- Currently our Fire Marshal's position is part-time. We <br />are in need of making his position full-time in the next year or two. It takes us <br />over IV, years to make cover all of the businesses in the three cities. Plan review <br />and inspections for building construction, both new and remodels takes up a lot of <br />Fire Marshal's time. Schools, gas stations and liquor establishments require <br />annual inspections. Having accurate information on all buildings is crucial for <br />pre-planning, this is important for firefighter safety. <br /> <br />3 <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.