My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-23-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 08-23-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:41 PM
Creation date
11/14/2006 3:35:45 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.~ <br /> <br />I <br /> <br />. <br /> <br />e <br /> <br />. <br /> <br />URS <br /> <br />Agenda Item 2E <br /> <br />MEMORANDUM <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phon" (6]2) 370-0700 <br />Fax: (612) 370-1378 <br /> <br />To: <br /> <br />Ms. Michelle Wolfe! <br />City of Arden Hills <br /> <br />Copy: <br /> <br />Nick Landwer/URS <br />Tom Moore!AH <br /> <br />File: <br /> <br />37951-023-8001 <br /> <br />From: <br /> <br />a <br />1) \ & I'? <br /> <br />Greg Brown <br />Arden Hills City Engineer <br /> <br />Date: <br /> <br />August 18,2004 <br /> <br />Subject: <br /> <br />County Road E Pedestrian Improvements <br /> <br />Background <br />The Council authorized the City Engineer to prepare a feasibility report Jor pedestrian sidewalk <br />improvements to County Road E at the January 26,2004 Meeting. The general scope ofthe <br />improvements includes widening of the pedestrian walk along the COWlty Road E bridge across <br />TH 5] and construction of an at grade sidewalk from the signalized intersection east of the <br />bridge to the intersection of County Road E and Old Highway 10. We have developed a series <br />of options for the bridge crossing for council's consideration outlined in the March, 2004 <br />feasibility report. The report also describes options regarding the sidewalk counection to Old <br />Highway]O. <br /> <br />Bridge Improvements <br />Below is a genera] summary of the Bridge options we have developed to date: <br /> <br />Option A: <br />. Replace existing bridge north sidewalk and guardrail with F-type rail (I' -8" wide vs. 3' -8") <br />· Shift roadway centerline 3' to the north <br />. Narrow traffic lanes to 14' (currently] 5') <br />· Construct 6'-6" foot walk along the south side of bridge <br />. Estimated bridge construction cost: $60,000 <br /> <br />Option B: <br />· Replace existing bridge north sidewalk and guardrail with F-type rail (I' -8" wide vs. 3' .-8") <br />. Shift roadway centerline 3' to the north <br />· Narrow traffic lanes to 14' (currently ]5') <br />. Construct 7' -6" foot walk along south side of bridge with cantilever structurc improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.