Laserfiche WebLink
<br />Recycling of existing deteriorated pavements by pulverizing, mixing . <br />with ncw asphaltic oils and compacting in place. New paving <br />materials are then placed over thc cold recycled pavement similar to a <br />standard overlay. <br /> <br />b. Bituminous Overlay <br /> <br />Placement of an additional bituminous layer, generally one inch (I ") to <br />two inchcs (2") thick, over an existing bituminous surfaced street. <br /> <br />c. Concrete Pavement Restoration <br /> <br />Replacement of existing concrete panels that have deteriorated, <br />mudjacking panels to improve rideability, and the filling of joints and <br />cracks with petroleum based material to eliminatc flow water to the <br />base below the surface. <br /> <br />d. Crack Scaling <br /> <br />Placement of petroleum based material in the cracks of a bituminous . <br />surfaced street for the purpose of eliminating the flow of water from <br />the surface to the aggregate base material blow. <br /> <br />e. Bituminous Seal Coating <br /> <br />Placement of petroleum based material and aggregate on an existing <br />bituminous surfaced street for the purpose of filling cracks and <br />covering mild wear. <br /> <br />f. Bituminous Surfacing Patching <br /> <br />Repair or replacement of existing bituminous surfacing that has <br />deteriorated. <br /> <br />l\EarthlFinancelFinanccDirectorlAPTF\2004Assessment Policy: Revised 9/1/04 <br /> <br />. <br /> <br />2004 Assessment Policy - Page 24 <br />