Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />ARDEN HILLS CITY COUNCIL WORKSESSION <br />AUGUST 23, 2004 <br /> <br />5 <br /> <br />Council Member Larson suggested that neighborhoods need to make the decision whether or not <br />the no parking signs should be installed. It may be difficult to enforce the no parking signs if <br />they are not consistently located throughout the neighborhood. <br /> <br />City Administrator Wolfe stated that the City Council needs to approve the location of the no <br />parking signs. City staff will work on creating an ordinance that addresses the location and <br />implementation of no parking signs. If residents would like to obtain a no parking sign they are <br />advised to contact the City. A letter will be sent to the residents affceted by this policy <br />explaining the procedure for obtaining a no parking sign. <br /> <br />City Administrator Wolfe stated that a few residents have suggested a no left turn sign at the <br />Glenview and Crystal intersection and Fairview and Lake Valentine Road intersection. <br /> <br />Mayor Aplikowski recommended that a speed limit sign also be placed in this area. <br /> <br />Council Member Grant stated that a number of students have figured out how to get around the <br />congestion by using residential roads in the neighborhood. <br /> <br />A resident recommcnded that speed bumps be installed on Lakc Valentine Road. Studies have <br />shown that speed bumps typically do not slow down traffic in residential neighborhoods. <br /> <br />The Ramsey County Sheriffs Department will try to be more proactive in the enforccment of <br />speed limits around Mounds View High School. <br /> <br />Mayor Aplikowski stated the City will place a no left turn sign at the intersection of Crystal and <br />Lake Valentine Road. <br /> <br />County Road E Brid2e and Path <br />Greg Brown, City Engineer, reported that the City conducted a feasibility study for sidewalk and <br />bridge improvements along County Road E. The following options were discussed: <br />Bridge Improvements- <br /> <br />Option A <br />I. Replace existing north sidewalk and guardrail; <br />2. Shift roadway centerline 3" to the north; <br />3. Narrow traffic lanes to 14 Ft; <br />4. Construct 6 Ft by 6 In foot walk along the south side of bridge; <br />5. Estimated Cost-$60,000. <br /> <br />Option B <br />I. Replace existing bridge and guardrail; <br />2. Shift roadway centerline 3" to the north; <br />3. Narrow traffic lanes to 14 Ft; <br />4. Construct 7 Foot walk way along south side of bridge cantilever structure; <br />5. Estimated Cost-$80,000. <br />