<br />Schedule: B - KARTH LAKE PUMP STATION
<br /> Unit Contract Contract To~Date TcrDate
<br />No. Item Unit Price Quantity Amount Quantity Amount
<br />. MOBILIZATION lS $3,925,00 1.00 $3,925.00 1,00 $3,925.00
<br />1.501
<br />2 BITUMINOUS PAVEMENT (PATH PATCHING) SY $24.75 150,00 $3,712.50 0,00 $0,00
<br />2350.604
<br />3 4' HDPE PIPE SEWER IF $25.00 20.00 $500.00 20,00 $500,00
<br />2503.502
<br />4 4' HDPE BEND EA $25.00 1,00 $25,00 1.00 $25.00
<br />2503.502
<br />5 6' x 4' REDUCER EA $35.00 1,00 $35.00 1,00 $35,00
<br />2503.502
<br />6 F & I ELECTRICAL CONTROL SYSTEM LS $23,100.00 1,00 $23,100.00 1,00 $23,100,00
<br />2503.502
<br />7 FURNISH SUBMERSIBLE PUMP LS $14,500,00 1,00 $14,500.00 1,00 $14,500.00
<br />2503.502
<br />8 6' HDPE FORCEMAIN LF $17,60 1,520,00 $26,752.00 1,520,00 $26,752,00
<br />2503.502
<br />9 CONNECT TO EXISTING STORM SEWER STUB EA $1,BOO,OO 1.00 $1,800,00 1.00 $1,800,00
<br />2503.503
<br />10 DRAINAGE STRUCTURE SPECIAL, 27' EA $750.00 1,00 $750,00 1.00 $750,00
<br /> (HANDHOLE)
<br />2503.602
<br />11 RAFT ASSEMBLY (FOR SUBMERSIBLE PUMP) EA $3,000,00 1,00 $3,000,00 1.00 $3,000,00
<br />2503.602
<br />12 SILT FENCE TYPE HEAVY DUTY IF $3.00 1,000,00 $3,000,00 100,00 $300,00
<br />2572.502
<br />13 SODDING TYPE LAWN SY $4,00 3,000.00 $12,000,00 600,00 $2,400,00
<br />.5.505
<br /> WOOD FIBER BLANKETS TYPE REGULAR SY $3,00 200.00 $600.00 200,00 $600,00
<br />2575.523
<br />15 RESTORATION lS $5,000,00 1,00 $5,000,00 1.00 $5,000,00
<br />2575.602
<br /> Subtotal: $98,699.50 $82,687,00
<br /> Grand Total: $232,772,50 $206,116,00
<br />
<br />.
<br />
<br />Page 4 of 5
<br />
|