My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-12-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 10-12-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:46 PM
Creation date
11/14/2006 3:36:07 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />... ~'-, <br /> <br />. <br /> <br />URS <br /> <br />Agenda Item 2E <br /> <br />OR\GINAL <br /> <br />MEMORANDUM <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1378 <br /> <br />To: <br /> <br />37951-023-8001 <br /> <br />Ms. Michelle Wolfe/ <br />City of Arden Hills <br /> <br />Nick LandwerJURS <br />Tom Moore/AH <br /> <br />File: <br /> <br />Copy: <br /> <br />From: <br /> <br />Greg Brown <br />Arden Hills City Engineer <br /> <br />Date: <br /> <br />February 11, 2004 <br /> <br />Subjec1: <br /> <br />County Road E Pedestrian Improvements <br /> <br />Background <br />The Council authorized the City Engineer to prepare a feasibility report for pedestrian sidewalk <br />improvements to County Road E at the January 26,2004 Meeting, The general scope of the <br />improvements includes widening ofthe pedestrian walk along the County Road E bridge across <br />TH 51 and construction of an at grade sidewalk from the signalized intersection east ofthe <br />bridge to the intersection of County Road E and Old Highway 10. Weare developing a series of <br />options for the bridge crossing for council's consideration and will discuss them in greater detail <br />at the work session, Below is a general summary of the options we are developing: <br /> <br />Option A: <br />. Replace existing bridge north sidewalk and guardrail with F-type rail (l' -8" wide vs. 3' -8") <br />. Shift roadway centerline 3' to the north <br />· Narrow traffic lanes to 14' (currently 15') <br />. Construct 6' -6" foot walk along the south side of bridge <br />. Estimated bridge construction cost: $60,000 <br /> <br />Option B: <br />. Replace existing bridge north sidewalk and guardrail with F-type rail (1' -8" wide vs. 3' .-8") <br />. Shift roadway centerline 3' to the north <br />. Narrow traffic lanes to l4 ' (currently 15 ') <br />. Construct 7' -6" foot walk along south side of bridge with cantilever structure improvements <br />to bridge beams <br />. Estimated bridge construction cost: $80,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.