My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-12-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 10-12-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:46 PM
Creation date
11/14/2006 3:36:07 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />/ <br /> <br />Memorandum <br />February 11, 2004 <br />Page 2 <br /> <br />. <br /> <br />Option C: <br />. Install new beam along south edge of bridge including center pier in roadway median <br />. No changes to roadway alignrnent or lane widths <br />. Remove southern guardrail <br />. Construct 10' walk along south side of bridge <br />. Optional interior rail between traffic and sidewalk <br />· Estimated bridge construction cost: $180,000 <br /> <br />Enhancement Options (could be included with option A, B or C) <br />. Orna.mental railings <br />. Decorative lighting <br />· Concrete patterning/reveals on face of bridge (visible from TH 5l) <br />. Concrete pilasters at ends of bridge <br /> <br />SidewalkffraiI <br />All options would include the construction of sidewalk/trail along the southern boulevard of <br />County Road E. The sidewalk/trail would be constructed within existing MnDOT and County <br />ROW from the signal east of the bridge to Old Highway 10. There are 7 single family homes <br />along the proposed alignment which would be impacted by the construction of a sidewalk . <br />adjacent to the street. We have not contacted any ofthese residents to date to obtain feedback <br />regarding the proposed project. The estimated construction cost for the sidewalk/trail <br />improvements is approximately $55,000. Therefore the project construction cos1s are estimated <br />to range from $115,000 to $235,000 (not including bridge enhancements). The project could be <br />funded with the city's State Aid account which currently has a balance of approximately <br />$500,000. <br /> <br />Worksession <br />Mr. Landwer will provide a presentation of the options including some renderings of the various <br />bridge options for Council's consideration, Depending upon direction received from the council, <br />the City Engineer will finalize the feasibility report for the project with the recommended <br />improvements, We anticipate the feasibility report to be presented at a Council meeting in <br />March. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.