Laserfiche WebLink
<br />STRUCTURES), integrally colored stucco, or heavy gauge aluminum or prefinished <br />architectural metal panels OR EIFS (TO A MAXIMUM OF 10% OR THE <br />STRUCTURE); <br />h) Page 5, Building Design and Materials, #4 C, should read as follows, "Synthetic stucco 6f <br />EIFS (Exterior Insulation ami Finish Systems) may be permitted as a secondary material <br />on upper floors only"; <br />i) Page 5, Building Design and Materials, #4 F, should be stricken completely; <br />j) Page 5, Building Design and Materials, #10 should be stricken completely; <br />k) Page 5, Building Design and Materials, #11, second line, should read as follows, <br />".. . submitted for staff PLANNING COMMISSION review AND CITY COUNCIL <br />APPROVAL at the time of submittal for building permit(s) FINAL POO"; <br />I) Page 6, parking Requirements, #3, second line should read, ",. ,shall be screened with a <br />decorative wall OF COMPATIBLE MATERIALS..."; <br />m) Page 6, Loading Docks, third line, should read, ". ..by means oflandscaping which is at <br />least 80% opaque within two years 6f AND by a screen walL.." and <br />n) Pages 8 and 9, Signage, be removed in its entirety from the document for review during <br />the final POO process, with the exception of#2 J, which should read as follows, <br />"Temporary leasing signs and marketing signs will be allowed AS RECOMMENDED <br />TO CITY COUNCIL BY STAFF". <br />2, Maximum office component requirement be increased from 50% to 100% as per the <br />"Variance Requests and Findings, (a)" section of the staff memorandum; <br />3, Minimum building size be reduced from 20,000 square feet to 6,000 square feet, as per the <br />"Variance Requests and Findings, (b)" section of the staff memorandum, allowing no more <br />than two structures of this size on the property; <br />4, Maximum building height be increased from 35 feet to eight stories as per the "Variance <br />Requests and Findings, (c)" section of the staff memorandum; <br />5, Parking ramps/decks be permitted within the front yard setback and the side yard/comer <br />setback as per the "Variance Requests and Findings, (d)" section ofthe staff memorandum; <br />6, Side yard interior and comer setbacks for the principal structure(s) must meet the <br />requirements of the Gateway Business District and are not permitted as proposed to be <br />decreased to 10' on the interior (where 20' is required) and 20' on the comer (where 50' is <br />required); <br />7, Reducing the specific landscape requirements (caliper inches) outlined in Appendix A, <br />Zoning Ordinance, relating to the square footage of floors of a building and building height <br />to reflect the proposed requirements in the applicant's Design Standards as per the "Variance <br />Requests and Findings, (f)" section of the staffmemorandum; <br />8, A landscape performance bond at 125% of the cost of materials and installation must be <br />provided prior to the issuance of a building permit; <br />9. Park land dedication will be required as part of the final plat, not to exceed ten percent of the <br />area ofthe property or, if providing cash in lieu ofland, the fair market value of the property <br />at the time of approval; <br />10, A permit from Rice Creek Watershed District will be required following City approval; <br />II, A monument sign at the comer of Highway 96 and Round Lake Road (City property) would <br />need to be reviewed and approved by the City Council prior to construction; <br /> <br />\\Earth\Planning\Planning Cases\2001\Ol-05 Chesapcakc\10-2S-04 CC Report 1 Year Extension.doc <br /> <br />Page 3 of4 <br /> <br />e <br /> <br />. <br /> <br />. <br />