<br />STRUCTURES), integrally colored stucco, or heavy gauge aluminum or prefinished
<br />architectural metal panels OR EIFS (TO A MAXIMUM OF 10% OR THE
<br />STRUCTURE);
<br />h) Page 5, Building Design and Materials, #4 C, should read as follows, "Synthetic stucco 6f
<br />EIFS (Exterior Insulation ami Finish Systems) may be permitted as a secondary material
<br />on upper floors only";
<br />i) Page 5, Building Design and Materials, #4 F, should be stricken completely;
<br />j) Page 5, Building Design and Materials, #10 should be stricken completely;
<br />k) Page 5, Building Design and Materials, #11, second line, should read as follows,
<br />".. . submitted for staff PLANNING COMMISSION review AND CITY COUNCIL
<br />APPROVAL at the time of submittal for building permit(s) FINAL POO";
<br />I) Page 6, parking Requirements, #3, second line should read, ",. ,shall be screened with a
<br />decorative wall OF COMPATIBLE MATERIALS...";
<br />m) Page 6, Loading Docks, third line, should read, ". ..by means oflandscaping which is at
<br />least 80% opaque within two years 6f AND by a screen walL.." and
<br />n) Pages 8 and 9, Signage, be removed in its entirety from the document for review during
<br />the final POO process, with the exception of#2 J, which should read as follows,
<br />"Temporary leasing signs and marketing signs will be allowed AS RECOMMENDED
<br />TO CITY COUNCIL BY STAFF".
<br />2, Maximum office component requirement be increased from 50% to 100% as per the
<br />"Variance Requests and Findings, (a)" section of the staff memorandum;
<br />3, Minimum building size be reduced from 20,000 square feet to 6,000 square feet, as per the
<br />"Variance Requests and Findings, (b)" section of the staff memorandum, allowing no more
<br />than two structures of this size on the property;
<br />4, Maximum building height be increased from 35 feet to eight stories as per the "Variance
<br />Requests and Findings, (c)" section of the staff memorandum;
<br />5, Parking ramps/decks be permitted within the front yard setback and the side yard/comer
<br />setback as per the "Variance Requests and Findings, (d)" section ofthe staff memorandum;
<br />6, Side yard interior and comer setbacks for the principal structure(s) must meet the
<br />requirements of the Gateway Business District and are not permitted as proposed to be
<br />decreased to 10' on the interior (where 20' is required) and 20' on the comer (where 50' is
<br />required);
<br />7, Reducing the specific landscape requirements (caliper inches) outlined in Appendix A,
<br />Zoning Ordinance, relating to the square footage of floors of a building and building height
<br />to reflect the proposed requirements in the applicant's Design Standards as per the "Variance
<br />Requests and Findings, (f)" section of the staffmemorandum;
<br />8, A landscape performance bond at 125% of the cost of materials and installation must be
<br />provided prior to the issuance of a building permit;
<br />9. Park land dedication will be required as part of the final plat, not to exceed ten percent of the
<br />area ofthe property or, if providing cash in lieu ofland, the fair market value of the property
<br />at the time of approval;
<br />10, A permit from Rice Creek Watershed District will be required following City approval;
<br />II, A monument sign at the comer of Highway 96 and Round Lake Road (City property) would
<br />need to be reviewed and approved by the City Council prior to construction;