Laserfiche WebLink
<br />e <br /> <br />. <br /> <br />with all the marketing activities, the office market has been slow to improve, Peter Carlson of <br />Chesapeake states in his letter that the extension of their Master Plan POO would allow them to <br />be more successful in promoting the sites to major tenants who tend to be very risk averse, <br /> <br />It is important to recognize that the Chesapeake Master Plan POO would potentially include up <br />to two eight story office buildings, This sort of development is more consistent with what you <br />typically see at major interstate junctions than the underlying Gateway Business Zoning would <br />otherwise produce. The Gateway Business Zoning District appears to be geared toward <br />office/warehousing users and most likely did not adequately plan for the future potential of the <br />Northeast Quadrant property. Granting an extension to the Chesapeake Master Plan PUD not <br />only gives Chesapeake certainty, it gives the City of Arden Hills certainty that a high caliber <br />development would be built on the property within the parameters established through the POO, <br /> <br />While it seems advantageous to grant the extension to the Master Plan POO, it would also be in <br />the City's best interest to reserve the right for an updated traffic study, EA W, or other <br />supplementary documents as necessary at the time of application for the Final Plan POO, If <br />there are additional development regulations that change significantly between now and the time <br />of application for the Final Plan POO, the City should also reserve the right to have Chesapeake <br />comply with those regulations, Staff has included this language as a condition of approval. <br /> <br />Staff Recommendation <br /> <br />Staffrecommends approval ofthe requested one-year extension (to allow Chesapeake <br />Companies to submit a Final Plan PUD no later than September 25, 2005) subject to the <br />applicant continuing to abide by the 13 existing conditions of approval and adding a 14th <br />condition of approval. The conditions of approval would read as follows: <br /> <br />1. The proposed document "Gateway Business Center--Arden Hills, MN, Proposed Planned <br />Unit Development Design Standards", revision dated March 7, 2001, be amended <br />accordingly (additions are shown in CAPS, language removed is striekefl): <br />a) Page 1, Purpose and Intent, third line of the first paragraph should read, ",.. consist of A <br />PREDOMINA TEL Y office DEVELOPMENT and supporting ancillary uses". "; <br />b) Page 1, Permitted Uses, strike #1 relating to antennas and add it under Permitted <br />Accessory Uses; <br />c) Page 1, Permitted Accessory Uses, #1 should read, "Any incidental assembly, repair, <br />processing, CLASS I manufacturing, , ," <br />d) Page 2, Permitted Accessory Uses, #7 should read, "Day Care Nursery WITH LESS <br />THAN TEN CHILDREN"; <br />e) Page 2, Lot Area, Lot Width, and yard Requirements, #1, should read, "Lot Area: One <br />acre minimum, NOT TO EXCEED TWO LOTS OF THIS SIZE" <br />f) Page 4, Building Design and Materials, #4, last line of the paragraph, should read, ".. .of <br />the fayade, ACCESSORY BUILDINGS SHALL MEET THE SAME BUILDING <br />MATERIAL REQUIREMENTS AS PRINCIPAL BUILDINGS. Allowable materials"."; <br />g) Page 4, Building Design and Materials, #4 B, should read as follows, "Secondary exterior <br />building materials may be decorative block (LIMITED TO SINGLE STORY <br /> <br />. \\Earth\Planning\Planning Cases\2001\Ol~05 Chesapeake\10-25-04 CC Report 1 Year Extension.doc <br /> <br />Page 2 of4 <br />