My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-13-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 12-13-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:55 PM
Creation date
11/14/2006 3:36:51 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Agenda Item 6A . <br /> <br />URS <br /> <br />Memo <br /> <br />Thresher Square <br />700 Third Streer South <br />Minneapolis. MN 554t5 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1378 <br /> <br />Cc: <br /> <br />Murtuza Siddiqui / Arden Hills <br />Finance Director <br />Michelle Wolfe / Arden Hills <br />Tom Moore / Arden Hills <br /> <br />Gregory S. Brown 97JP <br />Arden Hills City En~e~ . <br /> <br />File: 31809367 <br /> <br />To: <br /> <br />From: <br /> <br />Date: December 7,2004 <br /> <br />Subject: 2003 PMP - Ingerson Neighborhood <br />Construction Contract Change Order #1 <br /> <br />. <br /> <br />Background <br />The Council awarded the 2003 PMP Ingerson Neighborhood Reconstruction project to Amt <br />Construction of Hugo, MN on June 9, 2003 for $1,903,536.10. The estimated construction cost <br />in the adopted feasibility report was approximately $2,125,000. Project work was substantially <br />completed in late fall 2003 with final punchlist items completed this past summer with the <br />exception of landscape warranty work due to expire next spring. Six partial payments totaling <br />$1,856,662.91 have been approved by the council to date. <br /> <br />Change Order Description <br />Change Order #1 addresses additional work which was required for the 2004 PMP Street <br />Reconstruction Project. The work associated with Change Order 1 is detailed in five items on <br />the attached Change Order Document. The following is a summary of the five general items. <br /> <br />Item 1- Additional Underground Utility Work: A number of minor storm sewer, sanitary <br />sewer and watermain modifications were necessary as a result of conflicts with existing <br />private utilities and house utility services not included on as built drawings. A number of <br />watermain gate valves were replaced due to poor existing working condition. The amount <br />for this work totals $70,624.63 <br /> <br />Item 2 - Additional Curb & Gutter Replacement (Karth Lake Neighborhood): The <br />contract provided for the removal and replacement of sections of misaligned or settled . <br />curb throughout the mill and overlay areas of the Karth Lake East neighborhood. The <br />actual amount of curb replaced exceeded the contract quantity. The additional curb was <br />marked by the field engineer and replaced at the contract unit price per foot. The amount <br />for this work totals $29,008.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.