Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Memorandum <br />December 7, 2004 <br />Page 2 <br /> <br />Item 3 - Additional Bituminous Mixture (Karth Lake Neighborhood): The contract <br />provided quantities of bituminous mixture to be placed for patching poor roadway surface <br />areas and areas adjacent to curb replacement prior to the overlay material being placed. <br />The actual amount of bituminous mix used for patching exceed the contract quantity due <br />to the higher amount of curb replacement and higher amount of general patching than <br />estimated. The additional mix was placed at the contract unit price per ton. The amount <br />for this work totals $18,703.30. <br /> <br />Item 4 - Additional Femwood Channel Grading: The Contractor was excavated material <br />from tbe channel per the plans. The contractor was subsequently ordered to replace a <br />portion of the excavatcd material back into the channel as a result of a complaint from an <br />adjacent resident. The amount for this work totals $2,152.00. <br /> <br />Item 5 - Additional Lawn Sod: The contract provided quantities of sod to restore areas <br />modified by roadway and pond grading activities. Additional areas of the boulevard were <br />disturbed by Excel Energy as a result of gas main replacement work performed prior to <br />the roadway construction. The actual amount of sod required for the project exceeded the <br />estimated amount. The additional sod was placed at the contract unit price per square <br />yard. The amount for this work totals $6,000.00. <br /> <br />The total requested change order amount is $126,487.93. The requested Change Order represents <br />approximately 6.6% of the original contract amount. A detailed cost breakdown is included with <br />the attached Change Order document. <br /> <br />Recommendation <br />The City Engineer recommends that the City Council approve Change Order #l for the 2003 <br />PMP Project totaling $126,487.93. The contract amount of $1,903,536.10 will therefore be <br />increased by $126,487.93 to a new total contract amount of $2,030,024.03. <br />