My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-13-2004
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2004
>
CCP 12-13-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:19:55 PM
Creation date
11/14/2006 3:36:51 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MnDOTTP21830~07 (12~92) <br /> <br />SHEET ~ OF ~ SHEETS <br /> <br />. <br /> <br />State of Minnesota - Department of Transportation <br /> <br />WORK ORDER <br /> <br />Contractor Amt Construction Company Inc. <br /> <br />w~o~ No. <br /> <br />19 <br /> <br />S.P. No. 187-109-01 <br />F.P. No. N/A <br />Contract No. <br />Job Location: Hamline Avcnuc and Ingerson Road (Betw. S.T. 51 and Lexington Avenue) <br /> <br />P.O. Box 549 <br />Hugo. MN 55038 <br /> <br />Address <br /> <br />In accordance with standard applications 1103 and 1403 you are hereby authorized and instructed to do the work described herein. <br /> <br />The engineer was notified by the contractor of a resident whose propcrty abutts the westerly side of the <br />Pemwood Ditch. The property owner is concerned with the way the ditch grading was performed along <br />his property line. After conferring with the city, as well as the property owner, it was determined that <br />the ditch would be modified to accommodate thc resident. The contractor was directed by the engineer <br />to haul the previously excavated material back to this propcrty, along with performing any grading as <br />required. <br /> <br />. The Contractor is hereby directed to proceed with the above identificd work. All work will be done in <br />accordance with the pertinent portions of the plan, MnDOT Specifications, Special Provisions, <br />Standard Plates and as directed by the Engincer. <br /> <br />Payment for this work shall be made at the negotiated unit price of $2,152.00Iump sum, and includes <br />all labor and materials to complete work. <br /> <br />The cost of this Work Order is $2,152.00. <br /> <br />Distribution: <br />State Aid Participation Requested <br /> <br />Co <br /> <br /> <br />/~~-Jkd <br />~ecl -' gine~;;~onslr. ~~~::r <br /> <br />Recei ved by: <br /> <br />By: <br /> <br />Date: <br /> <br />/~ --.8 -04--- <br /> <br />Date: <br /> <br />/) <br /> <br />G /" .y. <br />- w--v~ <br /> <br />. <br /> <br />Original to Contractor <br />Copy Engineer <br />Copy to Contractor Administration <br />
The URL can be used to link to this page
Your browser does not support the video tag.