Laserfiche WebLink
<br /> EXHIBIT 84 Scope ot Estima1e: Roadway - M&O, curb spot <br /> Red Fox Road - Mill & Overlay repairs, Drainage - Grit Chamber, Sanilary- Spot <br />-- repairs 10 pipe., Water. Replace Hydrant and Valves <br /> ESTIMATED aUANTIT1ES <br /> :C:h"ovOF! "lHJlLS_'"~PMP:- 'od:;;;:':';: '<",-,'::,'.>C7:2,;0.', "YJ!!f}'iii:);j;;f':_ <br /> F IBILlTi REPORT <br /> EsnMATED ESTIMATED ESTIWlTED E5fIMATED <br /> "'" ROADWAY DAAlNAGE SANJTAAV W,o,TEFlMAlN <br /> CONTIWO' "" "'" PRICE = PFlOJECTCOST PROJECT COST PFlOJECTOOSl PROJECT COST <br /> LUMP SUM $ 18,500_00 1.0 $ 18,500.00 <br /> $ $ $ $ <br /> REMOVE STORM SEWER PIPE IF $ 500 40.0 $ $ 200.00 . , <br /> REMOVE BITUMINOUS PAVEMENT SY , 200 500.' $ 1,000.00 $ . , <br /> REMOVE BITUMINOUS DRIVEWAY PAVEMENT SY $ 2.00 1,000.0 , 2,000.00 $ $ , <br /> REMOVE DRAINAGE STRUCTURE EACH $ 350.00 '.0 , $ 1,400_00 $ $ <br /> REMOVE GATE VALVE & BOX EACH $ 21lJOO '.0 . $ $ $ 84<).00 <br /> REMOVE HYDRANT & VALVES EACH $ 350.00 3D . $ $ , 1,050.00 <br /> 0.0 $ $ $ $ <br /> SALVAGE SIGN TYPE C EACH $ 50.00 3.0 , 150_00 $ $ , <br /> SALVAGE SIGN - STREET SIGN EACH $ 50.00 3D $ 150.00 , $ , <br /> 0.0 . , $ . <br /> COMMON EXCAVATION P Cy $ 7.60 j 000_0 . 7,600.00 . $ , <br /> SUBGRADE EXCAVATlON EV CY $ 7.40 500.0 $ 3,700.00 $ , . <br /> SELECT GRANULAR BORROW C P CY $ 12.40 1,500.0 $ 18,600.00 . $ $ <br /> 0.0 . . S . <br /> AGGREGATE BASE, CLASS 5 TON $ ,.ro 500.0 . 4,650.00 . $ . <br /> 0.0 . . . . <br /> BITUMINOUS MATERIAL FOR TACK COAT GAL $ 300 565.0 . 1,695.00 , . . <br /> 0.0 . $ . . <br /> 2.5" MILL & OVERLAY SY $ '.00 11,317.0 , 11,311.00 , . , <br /> TYPE LVWE45030C WEARING COURSE MJXTURE M&O TON $ 35.00 1,625.0 $ 56,875.00 , . , <br /> 0.0 , . . , <br /> 36'" RC PIPE APRON EACH $ 1,000.00 1.0 , , 1,000.00 , , <br /> 0.0 , $ . $ <br /> 18 INCH RC PIPE SEWER DESIGN 3006 CL III LF $ 37.00 40.0 , . 1,48000 . $ <br /> 36 INCH RC PIPE SEWER DESIGN 3006 CL III IF , 40.00 40.0 , , 1,600.00 . $ <br /> 0.0 . , . $ <br /> F&I HYDRANT EA $ 2,500.00 30 . $ . . 7,500.00 <br /> 6" GATE VALVE AND BOX EA $ 700.00 '.0 . $ , . 2,800.00 <br /> 0" DIP WATER MAIN IF , 50.00 20.0 $ , $ . 1,000.00 <br />~ INSULATION SY $ 15.00 400.0 . , , . 6000.00 <br /> WATERMAIN FmlNGS LB $ 300 500.0 . , , . 1,500.00 <br /> 0.0 . , , . <br />-- CONSTRUCT DRAINAGE STRUCTURE 2' ~ 3' LF $ 318.20 5.0 $ . 1,591.00 , . <br /> CONSTRUCT DRAINAGE STRUCTURE DSGN 50-4020 IF $ 3'"-00 12.0 $ , 4,080.00 , $ <br /> CASTING ASSEMBLY EACH $ 400.00 '.0 . . 1,600.00 . . <br /> ADJUST RING FRAME AND CASTING EACH $ "".00 '.0 . $ 1800.00 . , <br /> DO . . . . <br /> S" PVC SDR26, 10' -12' LF $ "'.00 100.0 . . $ 4,000.00 . <br /> DO $ $ . , <br /> CONCRETE CURB & GUTTER SPOT REPAIR B618 LF $ 22.00 1,212.0 , 26,664.00 . . <br /> 6 INCH CONCRETE DRIVEWAY APRON SY $ 35.50 50.0 , 1,925.00 . , $ <br /> CONCRETE PEDESTRIAN RAMP EACH $ 500.00 2.0 . 1,000.00 . . $ <br /> 7" CONCRETE VAlLEY GUTTER IF $ 25.00 40.0 . 1,000.00 $ . $ <br /> 0.0 , $ $ <br /> F&l SIGN PANEL TYPE C SF $ 2fJ.00 27.0 , 540.00 . $ . <br /> INSTALL SIGN TiPE C EACH $ 50.00 3.0 , 150.00 , , . <br /> 0.0 $ , $ . <br /> BAlE CHECK EACH $ 10.00 100.0 1,000.00 , $ . <br /> SILT FENCE, TYPE HEAVY DUTY IF , 2.60 1,000.0 . 2,500.00 , $ $ <br /> ROCK CONSTRUCTION ENTRANCE EACH $ 1,200.00 LD , 1,200.00 , , <br /> 12" STOP BAA - EPOXY MARKING IF 25.00 15.0 $ 375.00 . , . <br /> 0.0 . $ , . <br /> SODDING, TiPE LAWN ,y $ 2.80 2,()()(J.0 $ 5,600.00 $ . , <br /> CONSTRUCTION FENCE LF $ 3.00 5000 $ 1,500.00 $ . $ <br /> ESTIMATED CONSTRUCTION COST . 170,000.00 $ 14,800.00 , 4,000.00 . 20,700,00 <br /> <br /> <br /> <br />. <br />