Laserfiche WebLink
<br />("J <br /> <br />C) <br />, , <br /> <br />IV. TRAFFIC ANAL YSIS <br /> <br />. <br /> <br />A. CAPACITY AND LEVEL OF SERVICE <br />An intersection capacity analysis was conducted for the study intersections per <br />the Highway Capacity Manual. The traffic forecasts shown on Figures 5, 6, 8, <br />and 9 were used with the existing traffic control and lane configurations shown in <br />Figure 2 to calculate LOS grades for the study intersections. It is assumed the <br />driveway access to Highway 96 will be stop controlled and that an eastbound to <br />southbound right turn lane will be provided on Highway 96 at the site's access. <br />The curb and pavement currently exist for this right turn lane, but the striping will <br />need to be revised. The LOS results are shown in Tables 2 and 3. <br /> <br /> <br />Table 2 - Forecasted 2007 Weekda AM Peak Hour LOS Results <br />;;t'iifl)!~pm~:R!fI'IiI'ii-~liiljjill,!i:'~~I\iii;; !if"'.'"."'l"';;' <br />"!'JHi~!!~_~mN("\n:~JiMf~ "..,.$h" '" g~!g~~;"~,,, ~,.-~Ii?:~""~",,, <br />Hi hwa 96/Hamline Avenue Si nal C C <br />Hamline Avenue/Karth Lake Circle Side Street Sto Si n F F <br />Hi hwa 96/Site Access Side Street Sto Si n n-a A <br />Note: The LOS shown is the overall LOS at signalized intersections or it is the LOS for the worst <br />movement at an intersection with side street, stop sign control. <br /> <br /> <br />Table 3 - Forecasted 2007 Weekda PM Peak Hour LOS Results <br />)'mtr~urQji~Qnti'!)li';;i1i1i1. ,iN~al"ii.l~)I,.t:mU!:lt. <br />Hi hwa 96/Hamline Avenue Si nal E E <br />Hamline Avenue/Karth Lake Circle Side Street Sto Si n F F <br />Hi hwa 96/Site Access Side Street Sto Si n n-a C <br />Note: The LOS shown is the overall LOS at signalized intersections or it is the LOS for the worst <br />movement at an intersection with side street, stop sign control. <br /> <br />. <br /> <br />The Arden Hills Office Park traffic will have a negligible impact on the operation <br />of the Hamline Avenue corridor. There is no difference in the Level of Service <br />results between the build and no-build scenarios at the Highway 96/Hamline <br />Avenue intersection or the Hamline Avenue/Karth Lake Circle intersection. The <br />right-out access to Highway 96 will operate at LOS C or better during the peak <br />hours. The Level of Service calculations are in the Appendix. They include LOS <br />calculations for each intersection approach. <br /> <br />Hamline Avenue provides an alternate access to Interstate 694 for vehicles that <br />normally access the Interstate from Lexington Avenue. The County is improving <br />Lexington Avenue this summer to alleviate congestion. A portion of the traffic <br />currently using Hamline Avenue as an alternate route to Lexington Avenue will <br />shift back to Lexington Avenue when it is improved. County staff plan on <br />reviewing the operation of the Highway 96/Hamline Avenue intersection when lhe <br />Lexington Avenue improvements are completed. The poor Level of Service <br />forecasted for 2007 can be alleviated by removing the north/south split phasing <br />of the traffic signal. <br /> <br />. <br /> <br />Arden Hills Office Park <br />Traffic Impact StlH~V <br /> <br />13 <br /> <br />Arden Hills. MN <br />May 2005 <br />