Laserfiche WebLink
<br />, . , <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />/--.-) <br />{ } <br /> <br />Development (POO) process allows flexibility in reviewing the setbacks, layout, design, and <br />other aspects of development; to allow a development is in the best interest of both the applicant <br />and the City. <br /> <br />The applicant has requested additional signage area, use of a building material which is not <br />included in the NB District building materials, and reduced parking setbacks along the northern <br />portion of the site. The applicant has also proposed the following features to offset some of the <br />aforementioned deficiencies: a monument style freestanding sign, superior building materials <br />and design for the use, and a landscaping plan with caliper inches of trees greatly exceeding the <br />requirements. <br /> <br />Preliminary Plat <br /> <br />The proposed plat would create would create 31 lots; one for each office condominium and one <br />lot as the common area for the entire development. The common lot, Lot 31, would contain all <br />of the parking, green spaces, access drives, trash enclosures, wetlands, storm water facilities, and <br />most of the landscaping. Lots I through 30 would include the office condominium uses and a <br />ten foot clear space around all exterior walls. In addition the plat calls for vacating a pedestrian <br />way in the middle of the property where no trail or walkway was ever built, and dedicates a 20- <br />foot wide area at the west side of the property to relocate the existing City trail. <br /> <br />Review of a Preliminary Plat encompasses many of the criteria which will already be covered by <br />review of the other three actions requested, however they also have a slightly longer review <br />period. Therefore staff has included a separate Preliminary Plat review section (after the Plan <br />Review Comments) which will cover items that were not previously discussed. <br /> <br />Plan Review <br /> <br />lA. Zoning - NB regulations call for developments to be reviewed in spirit and intent of the <br />Planned Unit Development process. <br /> <br />Lot Size <br />This proposal would require a preliminary plat. The mtmmum lot size for a single <br />development in the NB district is 13,000 square feet with minimum lot dimensions of 100 <br />feet by 130 feet. The proposed development totals about 297,752 square feet with a lot depth <br />of277.66 feet and a lot width of 1072.90 feet. <br /> <br />Building Setbacks <br />Following is a comparison of the eXlstmg and proposed setbacks as compared with the <br />setback standards established by the Zoning Ordinance. <br /> <br /> <br />\\Earth'J'lanning\Plannillg Cases\2005\OS-12 Arden llills Office Park - Royal Oaks Realty ~ PUD, Preliminary Plat for Old City Hall & PW Site <br />(PENDING)\06-01-04 PC Report Royal Oaks 05-J2.doc <br /> <br />Page 3 of 18 <br />