My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
09-12-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:46 AM
Creation date
11/14/2006 4:22:50 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~SSVfbbE <br /> <br />. Physical Demands & Workinl!: Conditions: <br /> <br />. <br /> <br />. <br /> <br />Most work is in a nonnal office environment. Limited Ii fting of twenly five pounds or less is <br />required up to 15% of the time. Travel within the City or region to view projects or attend mcetings <br />is likely to occur two to three times weekly. Therc is some exposure to field or construction site <br />conditions when visiting projects within the City. Occasional attcndance at evening Council <br />meetings and related meetings is required. <br /> <br />The Civil Engineer is responsible for divcrse matters, many of which have deadlines and require <br />significant attention to detail. Up to 45% of the timc, work is performed at the highest level of detail <br />and pressure of deadlines. <br /> <br />\ \Metro-inet. uslardenhills'v1dmin'ICity AdministralorlEngineering\200 5\Civil Engineer 8-05 Rosed lIe. doc <br /> <br />Page3of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.