Laserfiche WebLink
<br /> Unit Contract Contract To.Date To.Date <br />No, Item Unit Price Quantity Amount Quantity Amount <br />27 DOZER HR $112,00 40.00 $4,480.00 0.00 $0.00 <br />2123 $980.0. <br />28 TANDUM DUMP TRUCK HR $70.00 40.00 $2,800.00 14.DO <br />2123 <br />29 FRONT END LOADER HR $118.00 40.00 $4,720.00 8.00 $944.00 <br />2123 <br />30 TRACTOR MOUNTED BACKHOE HR $90.00 40,00 $3,600.00 0.00 $0.00 <br />2123 <br />31 STREET SWEEPER {WITH PICKUP BROOM) HR $125,00 35.00 $4,375.00 32,00 $4,000.00 <br />2123 <br />32 AGGREGATE BASE, CLASS 5 TON $10.30 500.00 $5,150,00 500.00 $5,150.00 <br />2211 <br />33 AGGREGATE BASE ICV), CLASS 51P) CY $25,62 1 ,975.00 $50,599.50 1,975,00 $50,599.50 <br />2211 <br />34 CONCRETE PAVEMENT SY $27.00 1 ,375.00 $37,125.00 1 ,286.00 $34,722.00 <br />2301 <br />35 STRUCTURAL CONCRETE CY $83.00 25.00 $2,075.00 0.00 $0.00 <br />2301 <br />36 STRUCTURAL CONCRETE, HE CY $91.00 205,00 $18,655.00 214.00 $19,474.00 <br />230' <br />37 REINFORCEMENT 8ARS (EPOXY COATED) LB $1.00 1,000.00 $1,000.00 108.00 $108.00 <br />2301 <br />38 BITUMINOUS DRIVEWAY SY $14,00 2,075.00 $29,050.00 2,151.00 $30,114.00 <br />2350 <br />39 6' CONCRETE DRIVEWAY SY $41.00 500.00 $20,500.00 685.00 $28,085.00 <br />230' <br />40 BITUMINOUS MATERIAL FOR TACK COAT GAL $1.80 307.00 $552.60 425.00 $7650~. <br />2357 <br />41 TYPE LVWE35030C WEARING COURSE TON $41.00 685.00 $28,OB5.00 695.00 $28,495.00 <br /> MIXTURE <br />2350 <br />42 TYPE L VNWE35030C BASE COURSE MIXTURE TON $41.00 685.00 $28,085.00 723.00 $29,643.00 <br />2350 <br />43 AGGREGATE BEDDING MATERIAL ICV) CY $30.00 50.DO $1,500.00 0.00 $0.00 <br />2451 <br />44 ADJUST CURB STOP BOX EA $200.00 5.00 $1,000.00 3.00 $600,00 <br />2504 <br />45 ADJUST GATE VALVE EA $300.00 5.00 $1 ,500.00 0.00 $0.00 <br />2504 <br />46 CONCRETE CURB & GUTTER DESIGN B618 LF $7.80 6,185,00 $48,243.00 5,195.00 $40,521.00 <br />2531 <br />47 6' CONCRETE DRIVEWAY APRON SY $41.00 482.00 $19,762.00 463.00 $18,983.00 <br />230' <br />48 CONCRETE PEDESTRIAN RAMP EA $600.00 4.00 $2,400.00 4.00 $2,400.00 <br />49 7' CONCRETE V ALLEY GUTTER LF $15.00 80.00 $1,200.00 45.00 $675.00 <br />2531 <br />50 MODULAR BLOCK RETAINING WALL SY $180,00 85.00 $15,300.00 70.00 $12,600.00 <br />51 FURNISH AND INSTALL MAILBOX AND SUPPORT EA $64.00 43.00 $2,752.00 0.00 $0.00 <br />2540 <br />52 INSTALL MAILBOX EA $50.00 43.00 $2,150.00 43.00 $2,150.00 <br />2540 $8,300.0. <br />53 REVISE SIGNAL SYSTEM SYS $8,300.00 1.00 $8,300.00 1.00 <br />2565 <br />54 TRAFFIC CONTROL LS $2,200,00 1.00 $2,200.00 1.00 $2,200.00 <br />25<l3 <br /> Page 4 of 9 <br />