Laserfiche WebLink
<br /> Unit Contract Contract To-Date To&Date <br />No. Item Unit Price Quantity Amount Quantity Amount <br />55 INSTALL SIGN TYPE C EA $100,00 2,00 $200.00 0.00 $0.00 <br />.64 F&I SIGN PANEL TYPE C SF $31.00 28.00 $868,00 36.20 $1,122.20 <br />2564 <br />57 BALE CHECK EA $6.00 200.00 $1,200.00 0.00 $0,00 <br />2573 <br />58 SILTFENCE, TYPE HEAVY DUTY LF $2.80 1,090.00 $3,052,00 700.00 $1,960.00 <br />2573 <br />59 ROCK CONSTRUCTION ENTRANCE EA $100.00 2.00 $200.00 0.00 $0.00 <br />2573 <br />60 3'x6' CROSSWALK PAVEMENT. EPOXY SY $10.00 8.00 $80.00 0.00 $0,00 <br /> MARKING <br />3520 <br />61 12' STOP BAR. EPOXY MARKING LF $50,00 2.00 $100,00 0.00 $0,00 <br />3520 <br />62 SEEDING AC $1,600.00 0,30 $480.00 0.50 $800.00 <br />2575 <br />63 SODDING, TYPE LAWN SY $2.80 10,186.00 $28,520.80 10,096.00 $28,268.80 <br />2575 <br />64 MULCH MATERIAL TYPE 1 TON $130.00 3.00 $390.00 5.00 $650.00 <br />2575 <br />65 DISK ANCHORING AC $400.00 0.30 $120.00 0.50 $200.00 <br />2575 <br />66 COMMERCIAL FERTILIZER ANALYSIS 22-5.10 LB $0.50 450.00 $225.00 400.00 $200.00 <br />2575 <br />67 CONSTRUCTION FENCE LF $3,00 150.00 $450.00 150.00 $450.00 <br />- Subtotal: $601,512.36 $568,629.96 <br />Schedule: B . STORM SEWER <br /> Unit Contract Contract To-Date To-Date <br />No. Rem Unit Price Quantity Amount Quantity Amount <br />1 CLEARING AC $1,850.00 1.50 $2,775.00 0.90 $1,665.00 <br />2101 <br />2 GRUBBING AC $1.850.00 1.50 $2,775,00 0.90 $1,665.00 <br />2101 <br />3 REMOVE RCP PIPE SEWER (STORM) LF $15.00 245.00 $3,675,00 166.00 $2,490,00 <br />2104 <br />4 REMOVE CMP PIPE CULVERTS AND APRONS LF $15.00 100.00 $1,500.00 102.00 $1,530.00 <br />2104 <br />5 REMOVE DRAINAGE STRUCTURE EA $525.00 5,00 $2,625.00 6.00 $3,150.00 <br />2104 <br />6 REMOVE RCP APRON EA $320.00 4.00 $1,280.00 2.00 $640,00 <br />2104 <br />7 COMMON CHANNEL EXCAVATION CY $12.64 1,120.00 $14,156.80 1,500.00 $18,960,00 <br />2105 <br />8 12' RC PIPE APRON EA $320.00 3.00 $960.00 4.49 $1,436.80 <br />2501 <br />9 21' RCPIPEAPRON EA $440.00 1.00 $440.00 1.00 $440.00 <br />2501 <br />10 27" RC PIPE APRON EA $630.00 1.00 $630.00 1.00 $630.00 <br />_' 12' TRASH GUARD FOR 12' PIPE APRON EA $260.00 2.00 $520.00 4.75 $1,235.00 <br />2501 <br />12 4' PERF. PRC PIPE DRAIN LF $3.00 920.00 $2,760.00 600,00 $l,Boo.OO <br />2502 <br /> Page 5 of 9 <br /> ----- <br />