My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
03-21-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:45 AM
Creation date
11/14/2006 4:23:33 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> <br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />URS <br /> <br />Agenda Item 28 <br /> <br />MEMORANDUM <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 554]5 <br />Phone: (612)37Oc0700 <br />Fax: (612) 370-1378 <br /> <br />To: <br /> <br />Ms. Michelle Wolfe! <br />City of Arden Hills <br /> <br />Copy: <br /> <br />Nick LandwerlURS <br />Torn Moore!AH <br /> <br />File: <br /> <br />Pending <br /> <br />From: Greg Brown <br />Arden Hills City Engineer <br /> <br />Date: March 21, 2005 <br /> <br />Subject: 2005 PMP Update <br /> <br />Background <br />The feasibility report for the 2005 PMP was received by Council on January 10,2005 and a <br />public hearing was conducted on February 14,2005. The design of the project has been ongoing <br />and is nearing completion pending receipt of direction from Council on a few design issues. The <br />assessment hearing for the project is scheduled for April II, 2005. The City Engineer will <br />provide an overview of the project scope, design options requiring direction from council, <br />estimated project costs and public involvement and communication to date, The following is a <br />synopsis of the discussion items. <br /> <br />Project Scope <br />The proposed improvements include the following: <br />Reconstruction of Dunlap Street (32 feet wide with curb and drainage improvements) <br />Overlay of Northwoods Drive (6' mill on each side adjacent to curb, 2" overlay full width) <br />Overlay of Grey Fox Road (full width mill, 2.5" overlay full width) <br />Overlay of Red Fox Road (full width mill, 2.5" overlay full width) <br />TH 51 frontage road (needs council direction*) <br />- Option 1 - removal of frontage road, cuI de sac Red Fox Road, realign Grey Fox <br />Road for new TH 51 access, construct ponding area in old roadway space <br />- Option 2 - reconstruct frontage road generally in same alignment, widen to 32 <br />feet, (no ponding area with this option) <br />- Options included in the feasibility report showing one way frontage road and <br />access at Red Fox Road have been dropped from further development due to <br />discussions with area property owners, MnDOT staff and safety concerns. <br />Neighborhood Sidewalks (needs council direction*) <br />- Option I: construct 5' concrete sidewalks on selected streets (Dunlap, Red Fox <br />Rd. - Dunlap to Lexington, Grey Fox Rd_- Dunlap to Lexington <br />
The URL can be used to link to this page
Your browser does not support the video tag.