My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
04-25-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:45 AM
Creation date
11/14/2006 4:24:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Ms. Michelle WoJfe <br />April 25, 2005 <br />Page 3 <br /> <br />Breakdown of Basic Services <br />Feasibility Study <br />Preliminary Engineering Phase <br />Final Design Phase <br />Bidding Phase <br />Subtotal Basic Services (5.8% of construction) <br /> <br />35% <br />30% <br />30% <br />5% <br />100% <br /> <br />Estimated Fees for Additional Services (hourJy, not-to-exceed) <br />Field Survey: <br />CAD Technician: 80 Hours @ $65.00 <br />Survey Coordinator 12 Hours @$80.00 <br />Survey Crew (2 man) 176 Hours @$125.00 <br />Subtotal Additional Services (hourly) <br /> <br />. <br /> <br />Construction Services <br />10.0% of Construction Cost per the URS Contract Agreement <br />Subtotal Construction Services <br /> <br />$29,155.00 <br />$24,990,00 <br />$24,990.00 <br />$ 4,165.00 <br />$83,300.00 <br /> <br />$ 5,200,00 <br />$ 960,00 <br />$22.000.00 <br />$28,160.00 <br /> <br />$140,000.00 <br /> <br />Direct Expenses <br />Direct expenses for the project include items such as mileage, parking, photography, printing and delivery <br />services. URS will bill all expenses incurred on the project directly to the City with no URS markup. . <br />Expenses are anticipated to include geotechnical subconsultant ($4,000) printing and distribution of plans <br />and specifications ($2,500), construction materials testing ($4,500) and mileage ($1,500). The total <br />estimated amount for direct expenses is $12,500.00 <br /> <br />ESTIMATED FEE SUMMARY <br />Basic Services (percent of construction cost) <br />Additional Services (hourly, not-to-exceed) <br />Construction Services (percent of construction cost) <br />Expenses (estimated, no markup) <br />Total Estimated Cost <br /> <br />$ 83,300,00 <br />$ 28,160,00 <br />$140,000,00 <br />$ 12.500.00 <br />$263,960.00 <br /> <br />All work, therefore is estimated to be complete for a total amount of$263,960.00, F;nal amounts for <br />Basic Services and Construction Services will be based upon the actual construction cost of the project in <br />accordance with the Professional Services Agreement. Additional Services will be performed on an <br />hourly basis based upon the parameters outlined in the Professional Services Agreement. Expenses will <br />be billed directJy to the City with no URS markup. <br /> <br />. <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-1378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.