Laserfiche WebLink
<br />Memorandum <br />March 28, 2005 <br />Page 2 <br /> <br />Option A - Reconstruct two stations at a time (per CIP) <br />Two station project in 2005: Contractor Construction Cost <br />URS Design Fee (5,14%) <br />URS Survey Fee <br />URS Construction Inspection(lO%) <br />URS Printing/Mileage Expenses <br />Total Project Cost <br />Two station projeCt in 2006: Estimated Total Project Cost <br />Two station project in 2007: Estimated Total Project Cost <br />Option A - Estimated Total Project Cost: <br /> <br />Option B - Reconstruct one lift station per year <br />Lift Station #4 project in 2005 :Contractor Construction Cost <br />URS Design Fee (5,53%) <br />URS Survey Fee <br />URS Construction lnspection(lO%) <br />URS PrintinglMileage Expenses <br />Total Projcct Cost <br /> <br />Lift Station #9 project in 2006:Contractor Construction Cost <br />URS Design Fee (5,60%) <br />URS Survey Fee <br />URS Construction Inspection(IO%) <br />URS Printing/Mileage Expenses <br />Total Project Cost <br />Lift Station #1 project in 2007: Estimated Total Project Cost <br />Lift Station #1\ project in 2008: Estimated Total Project Cost <br />Lift Station #12 project in 2009: Estimated Total Project Cost <br />Lift Station #13 project in 2010: Estimated Total Project Cost <br />Option B - Estimatcd Total Project Cost: <br /> <br />. <br /> <br />~ $236,758 (Gridor bid) <br />=$ 12,170 <br />=$ 3,540 <br />~$ 23,675 <br />=$ 1,750 <br />=$277,893 => $278,000 <br />$290,000 <br />$305,000 <br />$873,000 <br /> <br />=$162,000 (Gridor est.) <br />=$ 8,960 <br />=$ \,770 <br />=$ 16,200 <br />=$ 1.500 <br />=$190,430 => $\90,000 <br /> <br />=$150,000 (Gridor est.) <br />=$ 8,400 <br />=$ 1,770 <br />=$ 15,000 <br />=$ \,500 <br />=$176,670 ~> $\77,000 <br />$185,000 <br />$195,000 <br />$205,000 <br />$215.000 <br />$1,167,000 <br /> <br />. <br /> <br />Option C - Reconstruct three lift stations in 2005, three in 2006 <br />Three station project in 2005 (Lift Stations #4, #9, # I) <br />Contractor Construction Cost =$320,OOO(engineer's est*) <br />URS Design Fee (4.9%) =$ 15,580 <br />URS Survey Fee ~$ 5,400 <br />URS Construction Inspection (10%) =$ 32,000 <br />URS Printing/Mileage Expenses =$ 2,000 <br />Estimated Total Project Cost ~$374,980 => $374,980 <br />Three station projcct in 2006 (#11, #12, #13): Estimated Total Project Cost: $390,000 <br />Option C - Estimated Total Project Cost: $765,000 <br />· Estimated cost of three lift stations assumes similar bid prices to those received in February, <br />2005, Gridor has indicated in conversations that their bid reflected a competitive "winter <br />market", Rebidding a three station project this summer may not yield the same prices depending <br />on the condition of the construction market. <br /> <br />. <br />