My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
07-18-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:46 AM
Creation date
11/14/2006 4:25:12 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />e <br /> <br />Ms, Michelle Wolfe <br />July 1,2005 <br />Page 2 <br /> <br />Construction Phase <br />URS will provide construction services in accordance with the Professional Services Agreement. The services will <br />include contract administration, shop drawing review, field inspections and construction staking, Construction <br />testing will be coordinated by URS but will be provided by others and will be billed directly to the City by the firm <br />perfonning the work, <br /> <br />ADDITIONAL SERVICES <br />In addition to the Basic Services detailed above, URS will provide additional services for field survey necessary for <br />the project. <br /> <br />Field Survey <br />Field surveying will be completed for the project during both the Preliminary and Final Design Phases of the <br />project. It is anticipated that the survey will be a topographical survey to include right of way, easements, existing <br />utilities and all topographic points which, will be impacted by this project. All survey information will be based <br />upon the Ramsey County Coordinate System in order to allow easy correlation with City GIS mapping information, <br /> <br />ESTIMATED COSTS <br />We propose that the basic services identified above be completed on a percentage of construction cost basis <br />consistent with the terms of our Professional Services Agreement. The preliminary estimate for the project cost <br />including 18% for Engineering and construction administration is $500,000 all of which would be funded from the <br />sanitary sewer enterprise fund, The total budgeted project cost in the CIP for lift stations are $200,000 (2006) and <br />$200,000 (2007) for a total of $400,000, The CIP budget should be adjusted during the annual review this summer <br />to reflect the current estimated cost as well as the fact that the project will be completed in one year instead of two <br />years, An outline of our estimated fees and direct expenses for the project are detailed below: <br /> <br />Ie <br /> <br />Estimated Fees for Basic Services <br />Percentage Multiplier to be used for Basic Services based upon estimated construction cost of $425,000,00 and <br />curve included on Exhibit D of the Professional Services Agreement: 4.70% <br /> <br />Breakdown of Basic Services <br />Design Phase (90% of 4,7%) <br />Bidding Phase (10% of 4,7%) <br />Construction Services (10% of Ave, 3 bids) <br />Subtotal Basic Services (14,7% of construction) <br /> <br />$17,980.00 <br />$ 2,000,00 <br />$42.500,00 <br />$62,480,00 <br /> <br />Estimated Fees for Additional Services (hourly, not-to-exceed) <br />Field Survey: <br />CAD Technician: 16 Hours @ $65,00 <br />Survey Coordinator 4 Hours @ $85,00 <br />Surveyor 120 Hours @ $60,()() <br />Subtotal Additional Services (hourly) <br /> <br />$ 1,040,00 <br />$ 340,00 <br />$ 7.200,00 <br />$ 8,580,00 <br /> <br />ie <br />
The URL can be used to link to this page
Your browser does not support the video tag.