My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-05
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2005
>
08-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2012 10:46:46 AM
Creation date
11/14/2006 4:25:15 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. 2006 PMP Ridgewood Neighborhood <br /> Preliminary Cost Estimate - Roadway Improvements <br />. <br />. Item Unit Cost Est. Quantitv Total Cost <br /> MOBILIZATION LS $50,000.00 1 $ 50,000.00 <br />. REMOVE BIT PAVEMENT SY $2.25 16850 $ 37,912.50 <br /> REMOVE BIT DRIVEWAY SY $3.00 1503 $ 4,509.00 <br />. REMOVE CONCRETE DRIVEWAY SY $3.00 755 $ 2,265.00 <br />. TEMPORARY ROCK CONSTRUCTION ENTRANCE EA $500.00 4 $ 2,000.00 <br />RETAINING WALL SF $25.00 2000 $ 50,000.00 <br />. COMMON EXCAVATION CY $8.00 10050 $ 80,400.00 <br />SUBGRADE EXCAVATION CY $12.00 1000 $ 12,000.00 <br />. SELECT GRANULAR BORROW CY $14.00 7480 $ 104,720.00 <br /> AGGREGATE BASE CY $25.00 5000 $ 125,000.00 <br />. BITUMINOUS WEAR TON $44.00 1610 $ 70,840.00 <br /> BITUMINOUS BASE TON $42.00 1610 $ 67,620.00 <br />. TACK COAT GAL $2.00 1405 $ 2,810.00 <br />. SALVAGE MAILBOX EA $55.00 62 $ 3,410.00 <br />BIT DRIVEWAY SY $25.00 1700 $ 42,500.00 <br />. CONCRETE DRIVEWAY SY $45.00 900 $ 40,500.00 <br />SALVAGE SIGN EA $50.00 16 $ 800.00 <br />. CURB AND GUTTER (B618) LF $9.00 11000 $ 99,000.00 <br /> SOD WITH 4' TOPSOIL SY $3.00 12000 $ 36,000.00 <br />. SILT FENCE LF $3.00 3100 $ 9,300.00 <br /> TRAFFIC CONTROL LS $2,000.00 1 $ 2,000.00 <br />. LANDSCAPING ALLOWANCE LS $5,000.00 1 $ 5,000.00 <br />. Subtotal $ 848,600.00 <br />. Contingency 10% $ 84,900.00 <br />Subtotal Roadway Construction Cost $ 933,500.00 <br />. Administration & Engineering 18% $ 168,000.00 <br /> TOTAL Roadway ProjeelCost $ 1,101,500.00 <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> --------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.