Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />2006 PMP Ridgewood Neighborhood <br />Preliminary Cost Estimate - Roadway Optional Improvements <br /> <br /> <br />I <br />MOBILIZATION LS $2.500.00 1 $ 2,500.00 <br />RETAINING WALL SF $25.00 800 $ 20,000.00 <br />REMOVE RETAINING WALL SY $100.00 120 $ 12,000.00 <br />Subtotal $ 34,500.00 <br />Contingency 10% $ 3,500.00 <br />Subtotal Retaining Wall Option 2 Construction Cost $ 38,000.00 <br />Administration & Engineering 18% $ 6,800.00 <br />TOTAL Retaining Wall Option 2 Project Cost $ 44,800.00 <br /> <br /> <br />CURB OPTION EXPOSED AGGREGATE LF <br />Administration & Engineering <br />TOTAL Project Cost Exposed Aggregate Curb <br />. COST IS ABOVE AND BEYOND REGULAR CURB & GUTTER <br /> <br />$5.00 <br />18% <br /> <br />$ <br />$ <br />$ <br /> <br />11000 <br /> <br />55,000.00 <br />9,900.00 <br />64,900.00 <br /> <br /> <br />CURB OPTION COLORED CONCRETE <br />Administration & Engineering <br />TOTAL Project Cost Colored Concrete Curb <br />. COST IS ABOVE AND BEYOND REGULAR CURB & GUTTER <br /> <br />$ <br />$ <br />